How a project runs.

Six stages, each closed with a document the client approves. The scope and schedule of each project are agreed after the site survey.

  1. 01

    Site survey

    Engineers visit the site, record the process, equipment and existing systems, and agree the task with the plant’s technical staff. Result: survey report and terms of reference.

  2. 02

    Systems assessment

    Control systems, networks, data sources and cybersecurity are documented. Result: inventory and integration plan.

  3. 03

    Design

    Architecture, equipment specification, network and security design, and acceptance tests. Result: design documentation for approval.

  4. 04

    Implementation and integration

    Installation, configuration and connection to existing PLC, SCADA, MES and ERP, in stages agreed with production.

  5. 05

    Commissioning and acceptance

    Each function is tested against the agreed acceptance tests together with the client. Result: acceptance report.

  6. 06

    Training and support

    Operators and engineers are trained, documentation is handed over, and the system is maintained under a support agreement.