Industries
Mining & Metallurgy
Mines, concentrators and smelters run heavy equipment around the clock across dispersed sites. Cost, safety and recovery depend on equipment availability, energy use and how quickly deviations are seen.
Key processes
- Extraction and haulage
- Crushing and grinding
- Beneficiation
- Smelting and refining
- Tailings and water
State programmes and requirements
32 digitalization and AI projects are planned for 2026–2030 at six state mining and metallurgical enterprises, covering production automation, AI, industrial safety and digital geology.
Source: President of the Republic of Uzbekistan, 2026A Center for Technological Transformation is being created to coordinate the programme, alongside the digitization of more than 36,000 geological reports.
Source: The Times of Central Asia, 2026
Operational challenges
- Unplanned stops of crushers, mills and conveyors
- Production data recorded per shift, by hand
- Safety of people around mobile and rotating equipment
- High electricity and water use per tonne
- Geological, production and maintenance data in separate systems
How the solutions work
Each scenario describes how a solution is built for this industry. The scope of a specific project is agreed after a site survey.
Process control for crushing and grinding
Crushers and mills are run from local panels, so feed rate and load vary by shift and overloads stop the equipment.
How it works
- Weighers, level and power measurements on feeders, crushers and mills
- PLC control loops for feed rate and mill load
- SCADA in the control room with alarms and trends
- Shift reports from the historian
Systems and protocols
- Existing PLCs over PROFINET, Modbus TCP or EtherNet/IP
- SCADA and historian
- Production reporting or MES
What is delivered
- Control design and I/O list
- PLC and SCADA software
- Commissioning and loop tuning
- Operator training and documentation
Indicators measured
- Throughput per hour
- Stability of mill load
- Stops by cause
Condition monitoring of conveyors, crushers and pumps
Bearings, gearboxes and belts fail without warning, and a stop of a main conveyor stops the plant.
How it works
- Vibration and temperature sensors on drives and bearings
- Edge gateway at the substation collects and filters the data
- Condition indicators and alarm limits per asset
- Maintenance work orders raised from alarms
Systems and protocols
- Wired or wireless sensors (Modbus, OPC UA, MQTT)
- SCADA
- Maintenance management system or ERP
What is delivered
- Asset criticality list and sensor layout
- Sensors, gateways and network
- Monitoring software with alarm rules
- Maintenance procedures
Indicators measured
- Unplanned downtime hours
- Time between failures
- Share of planned maintenance
Safety monitoring around mobile and rotating equipment
People enter danger zones at conveyors, crushers and loading points, and incidents are investigated after the fact.
How it works
- Industrial cameras at transfer points, loading areas and walkways
- Models detect people in restricted zones and missing protective equipment
- Alarms to the control room and local warning signals
- Events stored with video for review
Systems and protocols
- Existing video management system
- SCADA alarms and interlock signals, where agreed
- Safety reporting
What is delivered
- Zone map and camera layout
- Detection models adapted to the site
- Alarm workflow
- Event archive and reports
Indicators measured
- Zone violations per shift
- Response time to an alarm
- Recorded near misses
Energy and water per tonne
Electricity and water are paid for per site, while consumption per tonne by plant area is unknown.
How it works
- Meters on incomers, mills, pumps and compressors
- Data joined with production tonnage
- Consumption per tonne by area and shift
- Largest consumers reviewed with the plant
Systems and protocols
- Electricity and water meters
- SCADA and production reports
- ERP for cost allocation
What is delivered
- Metering plan
- Meters and data collection
- Energy reports
- Ranked list of saving measures
Indicators measured
- kWh per tonne by area
- Water per tonne
- Peak electrical demand
Digital model of a concentrator
Changes to equipment, flowsheet or layout are assessed on drawings, without a model that uses operating data.
How it works
- 3D model from drawings and laser scans
- Operating data from the historian on the model
- Scenarios for throughput and equipment changes
- Results reviewed by plant engineers
Systems and protocols
- Historian and SCADA
- CAD drawings
- Maintenance records
What is delivered
- 3D model of the plant
- Data connection
- Scenario models
- Training for engineers
Indicators measured
- Deviation of the model from measured data
- Scenarios assessed before a change
Security of plant control networks
Control networks of mines and plants are being connected to corporate systems; as critical information infrastructure they fall under national cybersecurity requirements.
How it works
- Inventory of control devices and connections
- Zones and conduits with a demilitarized zone
- Industrial firewalls and controlled remote access
- Monitoring of industrial network traffic
Systems and protocols
- PLC, SCADA and engineering workstations
- Corporate network
- Security monitoring
What is delivered
- Assessment report
- Segmentation and access design
- Configuration of firewalls and remote access
- Incident procedures and staff training
Indicators measured
- Share of assets in the inventory
- Connections passing through controlled conduits
- Time to detect unauthorized access