Pharmaceuticals · PH-10 · Packaging line productivity
$2 bn in imports. Are your lines running at full capacity?
The government aims to cut medicine imports and expand local production. Output is growing by around 30%. Before building a new line, you need to know how much time your existing lines are actually running.
Platform: Plant Pulse
Who it is for
- CEO
- Capacity.
- Production
- Plan.
- Engineer
- Downtime.
- QA
- Changeover cleanliness.
Where the problem lies
Changeover
Product changeovers and cleaning take a long time.
Minor stops
Short stops that are not recorded.
Speed
The line runs below its rated speed.
Rejects
Defective blisters and cartons.
How the loss is calculated
| Downtime | downtime hours × output per hour (units/h) × margin per unit |
|---|---|
| Changeover | number of changeovers × duration per changeover (h) |
| Speed | (rated speed − actual speed, units/h) × operating hours |
| Rejects | rejected units × unit cost |
Calculate with your data
Packaging line changeover time: lost capacity estimate
This calculator estimates the time one packaging line spends on product changeovers per month.
Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.
Values stay in this page and are not sent to the server.
Scenario estimate
0 / 6 values entered
Enter your operating figures to see the estimate.
You set the target changeover time yourself. It is not presented as achievable and must be confirmed through an audit, trials and GMP-compliant qualification. Freed time creates value only if demand, materials, packaging components and staff are available. The calculation uses contribution margin, not revenue. It does not confirm validation documents, GMP/GDP compliance or any inspection outcome. No exact timeline or price can be given without an audit.
Formulas and assumptions
This calculator estimates the time one packaging line spends on product changeovers per month. It compares your current changeover duration with a target duration that you enter. It then shows the hours freed, the extra units that could be packed and an estimate of contribution margin. Margin is counted only on the share of extra output you expect to sell. Enter values from your own measurements, such as MES or OEE records. Downtime, speed losses, rejects, labour, validation and investment costs are excluded. All results are estimates, not guaranteed outcomes.
- Baseline: time spent on changeovers
- Changeovers per month × current duration (min) ÷ 60 = hours per month.
- Scenario: changeover time at target duration
- Changeovers per month × target duration (min) ÷ 60 = hours per month. The number of changeovers is assumed to stay the same.
- Freed packaging capacity
- max(0; current − target duration, min) × changeovers per month ÷ 60 × actual output rate (units/h). This is potential capacity, not sales.
- Estimated contribution margin from freed capacity
- Freed units (units/month) × sellable share (%) ÷ 100 × contribution margin per unit (currency/unit). This is an estimate of potential value, not guaranteed savings.
Facts and global practice
National Statistics Committee
In January–May 2026, pharmaceutical production exceeded UZS 2.3 trn, up 29.4%.1
Customs Committee (kun.uz)
Medicine imports reached $2 bn in 2025; a goal has been set to replace imports with local production.2
yuz.uz
2026 target: UZS 8.5 trn, with $800 mn in projects.3
Reliamag
Körber PAS-X MES includes a KPI/OEE module.4
No public data was found on OEE for pharmaceutical lines in Uzbekistan.
OEE — every shift
Run, stop and counter data are collected from line signals; the operator selects the stop reason; OEE is calculated per shift.
- 01Signal
- Run
- Stop
- Counter
- 02Reason
- Operator
- Changeover
- Breakdown
- 03Calculation
- Availability
- Performance
- Quality
- 04Report
- Shift
- Line
- Trend
Modules
The current maturity level is shown next to each module.
| Line signal collection | PLC/sensor | Engineering capability |
|---|---|---|
| Stop reasons | Operator panel | Engineering capability |
| OEE report | Shift | Engineering capability |
| Batch linkage | WMS | Commercially available |
How we start
- 01
Line audit
Signals and process.
Outcome: measurement plan.
- 02
Pilot
One line, 30 days.
Outcome: OEE baseline.
- 03
Scale-up
All lines.
Outcome: plant-wide OEE.
- 04
Subscription
Monthly.
Outcome: trend.
What is measured
| OEE | % | System |
|---|---|---|
| Changeover time | Minutes | System |
| Minor stops | Count | Signal |
| Rejects | % | Counter |
What is needed to start
- Head of production
- List of lines
- PLC data
- Shift schedule
What we do not promise
- Firm timelines and prices without an audit
- GMP/GDP certification or inspection outcomes
- Approving validation documents on the client's behalf
- Results that have not been measured
Self-check
- Is OEE measured?
- Are stop reasons recorded?
- Is changeover time known?
- Are minor stops recorded?
- Does the line run at its rated speed?
- Are rejects visible by line?
- Are shifts compared?
- Are new-line decisions based on OEE?
- Is the data linked to batches?
- Is there a designated owner?
Line audit
We measure an OEE baseline on one packaging line.
- Map of gaps and break points
- Pilot plan
- Implementation fee and monthly subscription
Other solutions in this industry
- PH-01GDP warehouse: temperature and batch data in one system
- PH-02Shelf life and FEFO
- PH-03Warehouse operations with marking codes
- PH-04Moving to EU GMP: the electronic batch record
- PH-05Plant warehouse: quarantine, release and raw materials
- PH-06Compliance with reference prices
- PH-07Reimbursement: prescription, code, receipt and ESF
- PH-08Quality control laboratory and data integrity
- PH-09Imported medicines warehouse and customs requirements
Sources
- National Statistics Committee: pharmaceutical production, January–May 2026. kun.uz, 16.07.2026.
- "Uzbekistan seeks to cut $2bn medicine imports". kun.uz, 27.02.2026 (under the Presidential decree of 23.01.2024).
- Decree of 05.03.2026 on stimulating the pharmaceutical sector: 2026 targets. yuz.uz, 2026.
- Reliamag: "Best MES for Pharmaceutical Manufacturing 2026: an independent comparison". 2026.