Warehousing, wholesale and distribution · OD-05 · Warehouse Staff and Productivity
The warehouse is growing. Experienced warehouse workers are scarce.
Experts describe the shortage of skilled warehouse and logistics staff as one of the main barriers to growth in Central Asia. Demand will rise as more warehouses are built.
Platform: Goods Flow
Shortage of quality warehouse space, according to IBC Global estimates.1
Warehouse space under construction or in design, according to IBC Global data.1
Permanent jobs that logistics reforms could create by 2030, according to World Bank estimates.2
Staff should work from system-assigned tasks rather than memorising the warehouse layout.
Who it is for
- Warehouse owner
- Headcount and productivity.
- Warehouse manager
- Training new staff.
- HR
- Staff turnover and recruitment.
- Chief financial officer
- Cost per operation.
Where the problem lies
Knowledge held by one person
An experienced warehouse worker knows where each item is stored. When that person is absent, work slows down.
New staff learn slowly
Learning the warehouse layout takes weeks, and errors are frequent during that time.
Productivity is not measured
It is unknown who did how much work, so bonuses and plans are based on estimates.
Paper lists
With paper pick lists, picking errors and rework increase.
How the loss is calculated
| Learning period | new staff × learning period (days) × daily productivity gap (operations per day) |
|---|---|
| Picking errors | mis-picked lines × correction time per line (hours) × hourly labour cost |
| Extra staff | excess headcount × monthly cost per employee |
| Staff turnover | employees who left (per period) × recruitment and training cost per employee |
Calculate with your data
Productivity Loss During New Warehouse Staff Ramp-Up
This calculator estimates how many paid hours of new pickers are not converted into standard output until they reach the productivity standard.
Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.
Values stay in this page and are not sent to the server.
Scenario estimate
0 / 7 values entered
Enter your operating figures to see the estimate.
Only the ramp-up productivity gap is covered. Mis-picks, staff turnover, recruitment and training programme costs, overtime and excess headcount are excluded. These are different kinds of loss and are not added here. Average ramp-up productivity is assumed to be the same in both cases, which is a simplification. The value is a cost equivalent of hours that did not yield standard output, not a cash saving. The target ramp-up time is your assumption and is not guaranteed to be achievable. It must be verified with WMS measurements.
Formulas and assumptions
This calculator estimates how many paid hours of new pickers are not converted into standard output until they reach the productivity standard. All figures are per month. It shows the cost equivalent of these hours and the picking lines not completed. Enter your current ramp-up time from your WMS data and a target ramp-up time that you define yourself. Results are estimates, not promises.
- Ramp-up productivity gap cost (current)
- New hires (persons/month) × current ramp-up days × hours per day × (1 − average productivity % / 100) × hourly cost (UZS/h). The result is the cost of paid hours that did not yield standard output, in UZS/month.
- Ramp-up productivity gap cost (at target ramp-up)
- Same formula as the current case, but using your target ramp-up days instead of the current ones. The result is in UZS/month.
- Difference between current and target cases
- max(0; current days − target days) × new hires × hours per day × (1 − average productivity % / 100) × hourly cost. If the target is longer than the current ramp-up, the result is 0. This is the equivalent value of the difference, not a guaranteed saving, in UZS/month.
- Picking lines not completed during ramp-up (current)
- New hires × current ramp-up days × hours per day × (1 − average productivity % / 100) × standard rate (lines/h). This shows the missing warehouse capacity and is not added to the cost above. Unit: lines/month.
Facts and global practice
IBC Global experts
A shortage of skilled logistics staff and low digitalisation among small businesses are holding back growth.3
Central Asia Warehouse Summit, Almaty, 2024
The staff shortage is a key barrier to warehouse real estate and logistics development; there is a shortage not only of equipment operators but also of general workers.4
IBC Global, 2026
The shortage of quality warehouse space is about 400 thousand m²; 370 thousand m² is under construction or in design.1
World Bank
Logistics reforms could create 98–108 thousand permanent jobs by 2030.2
This section relies on regional expert opinion. Staff productivity and turnover must be measured separately for each warehouse.
Task-driven warehouse
Each employee receives the next task on a handheld terminal (TSD): where to go, what to pick up and where to put it. The system confirms each operation with a scan and calculates productivity.
- 01Task
- Receiving
- Putaway
- Picking
- 02Confirmation
- Location scan
- Item scan
- Quantity
- 03Productivity
- By employee
- By shift
- Operation type
- 04Management
- Queue
- Priority
- Report
Modules
The current maturity level is shown next to each module.
| WMS task queue | Receiving, putaway and picking tasks | Commercially available |
|---|---|---|
| Handheld terminal app | Directed work and scan confirmation | Commercially available |
| Productivity reports | By employee, shift and operation | Commercially available |
How we start
- 01
Process audit
Operation times and errors are measured.
Outcome: baseline productivity.
- 02
Location addressing and tasks
Warehouse locations are addressed and tasks are configured.
Outcome: work with handheld terminals.
- 03
Training
Staff learn to work with handheld terminals.
Outcome: new staff become productive quickly.
- 04
Subscription
Monthly productivity reports.
Outcome: productivity trend.
What is measured
| Number of operations | By employee and hour | WMS |
|---|---|---|
| Picking errors | Mis-picked lines / total lines | WMS, inspection |
| Learning time | Days until a new employee reaches the standard rate | WMS |
| Task time | From assignment to completion | WMS |
What is needed to start
- Warehouse manager
- Staff list and shift schedule
- Warehouse layout
- Wi-Fi coverage for handheld terminals
What we do not promise
- Exact timeline and price without an audit
- Government decisions and deadlines
- Expanding warehouse space
- Unmeasured results or savings
- Reducing headcount by a specific percentage
Self-check
- Can a new employee work independently within one week?
- Is picking done without paper lists?
- Is every operation confirmed with a scan?
- Is staff productivity measured?
- Are picking errors counted?
- Are tasks assigned by priority?
- Does work continue when the experienced warehouse worker is absent?
- Are warehouse locations addressed?
- Are shifts compared with each other?
- Is there a person responsible for this area?
Process audit
We measure warehouse operations and staff productivity and provide a plan for moving to task-driven work.
- Baseline productivity
- Root causes of errors
- WMS and handheld terminals: implementation fee and monthly subscription
Other solutions in this industry
- OD-01Making full use of warehouse capacity
- OD-02Marked goods in wholesale trade
- OD-03Distribution: dispatch and returns
- OD-04Stock accuracy: cycle counting instead of an annual stocktake
- OD-06ESF and ETTN: shipment documents
- OD-07E-commerce fulfillment: piece picking and returns
- OD-08Cold storage: temperature and batch tracking
- OD-09Dock and yard: truck queues
- OD-103PL warehouse: accurate billing for services
Sources
- IBC Global, Central Asia Warehouse Summit (Tashkent). bizmedia.kz, 20.04.2026.
- World Bank, Uzbekistan Private Sector Diagnostic. spot.uz, 17.07.2026.
- IBC Global experts. retail.ru, 22.04.2025.
- Central Asia Warehouse Summit, Almaty. bizmedia.kz, 08.10.2024.