Textiles · TX-03 · Gas restrictions and energy planning

The gas stopped. The contract deadline didn't.

According to the Business Ombudsman, a large textile enterprise in Namangan stopped operating because of a gas outage and low pressure, putting its export contracts at risk. An enterprise that does not know its energy consumption by line cannot prepare for restrictions.

Platform: Plant Pulse

1,200+

Workers at the stopped enterprise (Ombudsman data).1

$2M+

Total value of three export contracts put at risk.1

6 million m³

Daily gas shortfall in winter 2025–2026, according to the Ministry of Energy.2

Once a restriction is announced, it is too late to plan.

Who it is for

CEO
Contract risk.
Chief power engineer
Gas and electricity.
Production
Line priorities.
Export
Deadlines.

Where the problem lies

  • Not by line

    Gas and electricity consumption by workshop is unknown.

  • Not linked to orders

    Which order runs on which line is not linked to energy data.

  • No alternative

    No backup fuel or generator plan has been calculated.

  • Late notice

    Restriction notices do not arrive in time.

How the loss is calculated

Downtimedowntime (h) × output (units/h) × margin (per unit)
Contractdelayed shipments (count) × penalty per shipment
Restartrestart events (count) × cost per restart
Wagesdowntime (h) × workers × hourly wage rate (per worker-hour)

Calculate with your data

Gas Curtailment Lost Margin and Idle Labour Calculator

This calculator estimates the contribution margin lost when production stops because of low gas pressure or gas curtailment.

Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.

Values stay in this page and are not sent to the server.

Scenario estimate

0 / 7 values entered

Enter your operating figures to see the estimate.

Results are estimates, not promises. They depend on the accuracy of your inputs. The target downtime hours are your own hypothetical scenario and are not presented as achievable. Gas supply, compliance with customer requirements, certification and savings are not guaranteed. All inputs must cover the same period (for example, a month or a year) and use the same currency. Exact costs and timelines for a backup plan or equipment can only be assessed through an audit.

Formulas and assumptions

This calculator estimates the contribution margin lost when production stops because of low gas pressure or gas curtailment. It uses contribution margin, not sales revenue. It compares your current (baseline) situation with a target scenario you define, for a period you choose. Take the inputs from your downtime log, meters and own accounts. Wages paid to idle workers during stoppages are shown as a separate result and are not added to the lost margin. Contract penalties, restart costs, the cost of backup energy and gas supply itself are excluded.

Baseline lost contribution margin
Downtime hours (h) × hourly output (units/h) × margin per unit (currency/unit) × unrecovered share (%) ÷ 100.
Scenario lost contribution margin
Scenario downtime hours (h) × hourly output (units/h) × margin per unit (currency/unit) × unrecovered share (%) ÷ 100.
Lost margin difference: baseline vs scenario
Baseline lost margin minus scenario lost margin (currency/period). Negative values are shown as 0. This is a hypothetical comparison, not guaranteed savings.
Baseline wages paid for idle time (separate)
Downtime hours (h) × idle workers (persons) × hourly labour cost (currency/h). This is a different type of cost and is not added to lost margin.

Facts and global practice

  • Business Ombudsman

    On 25 March, an appeal was submitted to the Ombudsman: an enterprise with more than 1,200 workers stopped operating because of a gas outage and low pressure, and three export contracts worth more than $2 million were put at risk.1

  • Business Ombudsman

    After the Ombudsman intervened, the enterprise was reconnected to the medium-pressure gas network.1

  • Ministry of Energy

    In winter 2025–2026, the gas shortfall reached approximately 6 million m³ per day.2

  • Textile industry presentation

    The official presentation listed expensive financing and logistics costs among the sector's constraining factors.3

An enterprise cannot control its gas supply. What it can control is knowing how much each line consumes and setting priorities for restriction periods in advance.

Consumption, priorities and planning

Energy consumption by line is linked to orders. Which orders go first during a restriction is calculated in advance.

  1. 01Measurement
    • Gas
    • Electricity
    • Steam
  2. 02Linking
    • Line
    • Order
    • Shift
  3. 03Planning
    • Priority
    • Alternative
    • Scenario
  4. 04Reporting
    • Production cost
    • Risk
    • Deadline

Modules

The current maturity level is shown next to each module.

Energy measurementMeters (via partner)Engineering capability
Order-to-line linkingProduction planEngineering capability
Restriction scenariosPrioritisationEngineering capability
1C integrationProduction costCommercially available

How we start

  1. 01

    Energy audit

    Meters and lines.

    Outcome: metering map.

  2. 02

    Measurement

    60 days.

    Outcome: consumption by line.

  3. 03

    Scenarios

    Winter plan.

    Outcome: readiness.

  4. 04

    Subscription

    Monthly report.

    Outcome: trend.

What is measured

ConsumptionkWh and m³ per unit of productMeter
DowntimeHoursLog
Delayed shipmentsCountSystem
Scenario readinessYes/noPlan

What is needed to start

  • Chief power engineer
  • List of meters
  • Order plan
  • List of lines

What we do not promise

  • Exact timeline and price without an audit
  • Guarantee of meeting buyer requirements
  • Certification
  • Unmeasured results or savings
  • Gas supply

Self-check

  1. Is gas consumption by line known?
  2. Is electricity consumption broken down by workshop?
  3. Is each order's line assignment linked to energy data?
  4. Is there a list of priority orders for restriction periods?
  5. Has an alternative energy source been assessed?
  6. Is there a procedure for notifying buyers in advance?
  7. Are downtime hours recorded?
  8. Is the restart cost known?
  9. Has a winter plan been prepared?
  10. Is there a designated responsible person?

Energy audit

We measure consumption by line and prepare a plan for restriction periods.

  • Metering map
  • Winter plan
  • Implementation fee and monthly subscription

Sources

  1. Business Ombudsman report: textile enterprise in Namangan stopped due to gas outage. spot.uz, 03.04.2026.
  2. Ministry of Energy: winter 2025–2026 gas restrictions. spot.uz, 26.02.2026.
  3. Presentation on the textile industry's 2025 results and 2026 objectives. gov.uz, 24.12.2025.