The equipment price is only part of the cost.
Manufacturers report spending hundreds of thousands of dollars on marking equipment, followed by monthly service fees and a separate cost for every unit.
Platform: Goods Flow
Spend on marking equipment, according to one manufacturer. Another reports more than half a million dollars.1
Integrator service per month, regardless of volume, according to one manufacturer.1
Cost increase due to marking, according to the same manufacturer.1
To reduce cost, you first need to see all of it: equipment, codes, consumables, service and downtime.
Who it is for
- Plant owner
- Total cost and return on investment.
- Finance director
- Cost per unit and monthly payments.
- IT manager
- Integration and supplier dependence.
- Chief mechanical engineer
- Service, spare parts and setup.
Where the problem lies
Service tied to a single supplier
If setup and repair are available only through the integrator, price and response time are outside the plant's control.
Per-unit cost is not visible
Codes, labels, ink and electricity are not counted as separate items in production cost.
Closed software
If data and settings remain in the supplier's software, replacing or expanding equipment becomes more expensive.
Downtime cost is not counted
Time spent waiting for a specialist and the resulting downtime are not added to cost.
How the loss is calculated
| Total cost of ownership, per year | equipment depreciation per year + codes per year + consumables per year + service per year + downtime cost per year |
|---|---|
| Per unit | (code cost per unit + consumables cost per unit) × units per year |
| Service | monthly fee × 12 + call-out costs per year |
| Downtime | hours per year spent waiting for a specialist × line cost per hour |
Calculate with your data
Annual total cost of ownership of a marking system
This calculator brings the annual cash cost of a marking system into one figure.
Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.
Values stay in this page and are not sent to the server.
Scenario estimate
0 / 9 values entered
Enter your operating figures to see the estimate.
Depreciation uses the straight-line method: equipment cost divided by useful life. A life below 1 year is treated as 1 year. For the hourly downtime cost, enter a basis you can justify, such as idle labour plus fixed costs, or lost contribution margin. Do not use revenue (turnover). Do not add the two results together. The calculator does not predict government decisions, deadlines or fines. It also does not promise any outcome from replacing the system or changing supplier. Exact prices and timelines are known only after an audit and commercial quotes.
Formulas and assumptions
This calculator brings the annual cash cost of a marking system into one figure. It covers equipment depreciation, codes, consumables and service. The cost of line downtime spent waiting for a specialist is shown as a separate result and is not added to the ownership cost. You enter every value yourself, using data from 1C, the warehouse, accounting, the service log and the operator panel. The period is one year. Financing interest, taxes, staff wages, software integration and legal costs are excluded. All results are estimates, not a guarantee of savings or prices.
- Annual cost of ownership (excluding downtime)
- Equipment cost ÷ useful life (at least 1 year), plus (code cost + consumables per unit) × annual units, plus monthly service fee × 12, plus annual out-of-contract service calls. Result in currency units per year.
- Full marking cost per unit
- Annual cost of ownership (excluding downtime) ÷ units marked per year (at least 1, to avoid division by zero). Because depreciation and service are included, this figure is higher than the code and consumables cost alone.
- Annual cost of downtime waiting for a specialist (separate)
- Monthly waiting minutes ÷ 60 = hours, × 12 months, × line downtime cost per hour. Result in currency units per year. This is an estimated loss exposure and is not added to the cost of ownership.
Facts and global practice
Juice and beverage manufacturer
More than $300,000 spent on marking equipment.1
Carbonated soft drinks and water manufacturer
More than half a million dollars spent on equipment alone.1
Juice and beverage manufacturer
Integrator service costs about $3,000 per month, regardless of volume.1
Same manufacturer
For a 200 ml pack: code UZS 68; sticker, ink and electricity UZS 15.1
Same manufacturer
Costs increased by 2–4% due to marking.1
Representative of a large manufacturer
Setup and commissioning mainly require foreign specialists, mostly from Russia; equipment is mainly sourced from Russia and China.2
UzBev association
The association has asked to pay for codes actually applied rather than in advance.2
Cost structure varies from plant to plant. These figures only show which cost items should be accounted for.
Seeing and managing cost
First, total cost of ownership is calculated in full. Then supplier dependence is reduced through local service and open integration.
- 01Audit
- Equipment list
- Contracts
- Per-unit cost
- 02Integration
- Asl Belgisi
- 1C
- Open formats
- 03Service
- Local engineer
- Setup manual
- Spare parts
- 04Control
- Monthly cost
- Unit cost
- Downtime
Modules
The current maturity level is shown next to each module.
| Total cost of ownership audit | Accounting for equipment, codes, consumables, service and downtime | Commercially available |
|---|---|---|
| Local service and setup | Inspection, reconfiguration and documentation of existing equipment | Commercially available |
| Asl Belgisi and 1C integration | Supplier-independent data flow | Commercially available |
| Equipment-independent camera inspection | Works with different printers and lines | Engineering capability |
How we start
- 01
Cost audit
Contracts, invoices and line data are collected.
Outcome: total cost of ownership by item.
- 02
Dependence assessment
Identify which work can only be done through the supplier.
Outcome: risk register.
- 03
Local service
Setup is documented and staff are trained.
Outcome: shorter response time.
- 04
Control
Monthly cost and unit cost are tracked.
Outcome: monthly report.
What is measured
| Marking cost per unit | Codes and consumables / units produced | 1C, warehouse |
|---|---|---|
| Monthly service cost | Payments and call-outs | Accounting |
| Service response time | Hours from call to recovery | Service log |
| Downtime waiting for a specialist | Minutes, per month | Operator panel |
What is needed to start
- Equipment and service contracts
- Invoices for codes and consumables
- List of lines
- Person responsible for IT and mechanics
What we do not promise
- Exact timeline and price without an audit
- Government decisions and deadlines
- Changes to line software without the equipment supplier's permission
- Unmeasured results or savings
- Legal services for terminating existing contracts
Self-check
- Has the total annual cost of marking been calculated?
- Is the per-unit marking cost shown separately in production cost?
- Are the service contract terms and response time known?
- Can plant staff perform setup themselves?
- Are settings and passwords kept at the plant?
- Can data be exported from the supplier's software?
- Is downtime spent waiting for a specialist recorded?
- Are spare parts available on the local market?
- Is the cost of expanding to another line known?
- Is there a person responsible for cost?
Total cost of ownership audit
We calculate the cost of your marking system by item and show where it can be reduced.
- Cost by item
- Supplier dependence risks
- Action plan
Other solutions in this industry
Sources
- Statements by manufacturers and UzBev. gazeta.uz, 15.04.2026.
- Statements by manufacturers and UzBev. gazeta.uz, 30.03.2026.