Water and beverages · WB-07 · Filling Line Efficiency (OEE)

The line is running. But how well?

According to an international benchmarking study, PET lines average around 50% OEE. We found no public data on lines in Uzbekistan. Each plant needs to measure this itself.

Platform: Plant Pulse

50%

Average OEE of PET lines, according to an international study. 33 companies, 2024.1

84%

Average availability of PET lines, according to the same study.1

0.7–0.8 million

Daily output of a large water producer, in units. According to the company, demand exceeds this.2

Before buying a new line, you need to know how much time the existing line is not running.

Who it is for

Production Director
Where line time is going.
Chief Mechanic
Breakdowns and recovery time.
Process Engineer
Format and product changeovers.
Plant Owner
New capacity or the existing line.

Where the problem lies

  • Availability: downtime

    Breakdowns, format changeovers, cleaning and waiting for raw materials. Often not recorded or recorded approximately.

  • Performance: slow running

    The line runs, but below nominal speed. Minor stops are also hidden here.

  • Quality: rejects

    Reworked or discarded product. Line time was spent, but there is no product.

  • Paper reports

    Figures written at the end of a shift do not show actual downtime.

How the loss is calculated

Availability lossdowntime (min) × nominal rate (units/min) × margin per unit
Performance loss(nominal − actual rate, units/min) × run time (min) × margin per unit
Quality lossrejected units × unit cost
In peak seasonlost units × margin per unit in periods when demand exists

Calculate with your data

Filling Line OEE and Lost Good Output Calculator

This calculator covers one filling line over a single period you choose, such as a shift, a week or a season.

Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.

Values stay in this page and are not sent to the server.

Scenario estimate

0 / 7 values entered

Enter your operating figures to see the estimate.

Costs not included: - material and packaging cost of rejected units; - rework, labour and energy; - repair costs; - penalties and other indirect costs. Scrap cost is a different kind of loss and is deliberately not added to the margin effect, to avoid double counting. Units not produced are not lost margin unless there was demand for them. Enter unmet demand only from order or sales records. The calculation uses contribution margin per unit, not sales revenue. The nominal rate must come from equipment documentation or a verified measurement. Results do not replace an audit and do not imply any change to line software.

Formulas and assumptions

This calculator covers one filling line over a single period you choose, such as a shift, a week or a season. From planned production time, downtime, nominal rate and line counter readings, it estimates availability and OEE. It also shows how many good units were not produced compared with the nominal rate. The margin effect of those units is counted only up to demand that genuinely went unmet in the same period. Enter all values from your own measurements for the same period. Results are estimates, not guaranteed savings or a promise of any OEE level.

Availability
(planned time, min − downtime, min) ÷ planned time, min × 100. Negative run time is treated as 0.
OEE (availability × performance × quality)
Good units (total − rejects) ÷ (planned time, min × nominal rate, units/min) × 100. This equals availability × performance × quality.
Good units not produced versus nominal rate
Planned time, min × nominal rate, units/min − good units. The result covers units lost to downtime, slow running and rejects; negative values are shown as 0.
Contribution margin exposure within unmet demand (estimate)
The smaller of good units not produced and unmet demand (units) × contribution margin per unit. This is an exposure estimate where demand existed, not guaranteed savings. Scrap cost is not included.

Facts and global practice

  • Lineview, 33 food and beverage companies, 2024 data

    PET lines: OEE 50%, availability 84%, efficiency 59%.1

  • Same study

    Across the 6 line types reviewed in the study, OEE ranged from 42% to 64%.1

  • Technical Director, large water producer, 2025

    The plant produces 700,000–800,000 units of water per day but cannot fully meet orders; a third line is under construction.2

  • Soft drink and water producer

    After the introduction of product marking, line efficiency dropped "in practice by more than 20%".3

OEE = availability × performance × quality. The figure depends on the measurement method; different plants can be compared only when measured the same way.

Measuring line time

Line signals are collected automatically; the operator only selects the stop reason. Results are visible without waiting for the shift to end.

  1. 01Signals
    • Running or stopped
    • Unit counter
    • Rejects
  2. 02Operator
    • Reason code
    • Format changeover
    • Comment
  3. 03Calculation
    • Availability
    • Performance
    • Quality
  4. 04Analysis
    • Top 5 reasons
    • Shift and format
    • Trend

Modules

The current maturity level is shown next to each module.

Line signal collectionRunning status and unit countersEngineering capability
Operator panelStop reason, format changeoverEngineering capability
OEE calculation and reportsAvailability, performance, quality, reasonsEngineering capability

How we start

  1. 01

    Baseline measurement

    Signals are collected on one line for several weeks.

    Outcome: actual OEE and main reasons.

  2. 02

    Root cause analysis

    Actions are selected for the largest losses.

    Outcome: action plan.

  3. 03

    Actions

    Format changeover, preventive maintenance, adjustment.

    Outcome: OEE is measured again.

  4. 04

    Scale-up

    Remaining lines are connected.

    Outcome: plant-wide metrics.

What is measured

OEEAvailability × performance × qualityOEE module
DowntimeMinutes by reasonOperator panel
Format changeoverFrom last good unit to first good unitLine signals
RejectsRejects / totalLine counter
Minor stopsCount and total durationLine signals

What is needed to start

  • Person responsible for the line
  • Line layout and nominal speeds
  • Ability to connect to signals
  • Training time for operators

What we do not promise

  • Exact timeline and price without an audit
  • Government decisions and deadlines
  • Changes to line software without the equipment supplier's approval
  • Unmeasured results or savings
  • Achieving a specific OEE level

Self-check

  1. Is OEE measured for each line?
  2. Are stops recorded automatically?
  3. Does the operator select the stop reason?
  4. Are the top 5 stop reasons known?
  5. Is format changeover time measured?
  6. Are minor stops accounted for?
  7. Are rejects calculated per line?
  8. Are shifts compared with each other?
  9. Are line metrics visible during the shift?
  10. Is there a person responsible for line efficiency?

Line efficiency measurement

We measure actual OEE and the main loss reasons on one line.

  • Actual OEE
  • Stop reason ranking
  • Action plan

Sources

  1. Lineview Global Benchmarking Report, food and beverage manufacturing, 2024 data. lineview.com, 2025.
  2. Technical Director, large water producer. kun.uz, 19.09.2025.
  3. Statements by producers and UzBev. gazeta.uz, 15.04.2026.