Building materials · QM-01 · From exchange contract to loading

Sold. Now it has to be loaded on time.

At least half of cement must be sold through the exchange. Failing to load on time under an exchange contract is no longer just a delay: there are cases in which the competition authority has treated it as a violation of law.

Platform: Goods Flow

at least 50%

of cement volume must be sold through the exchange; the requirement has been extended to 01.01.2028.3

26.6%

Share of cement offered on the exchange that was sold on 1–7.12.2025, according to UzRTSB.2

12.1 million t

Cement produced by large enterprises in January–July 2026.7

Selling on the exchange is only half the job. The other half happens at the gate, the weighbridge and in the documents.

Who it is for

General Director
Exchange obligations and penalty risk.
Commercial Director
Remaining volumes and deadlines under contracts.
Head of Dispatch
Queue, loading and weighbridge.
Chief Accountant
ESF + ETTN and 1C accounting.

Where the problem lies

  • Remaining volume is not visible

    How much has been loaded and how much remains under each exchange contract is calculated manually.

  • Queue managed by phone

    It is not known in advance which contract each truck is coming for or when it will arrive.

  • Weighbridge is isolated

    Weighing results are not automatically linked to the contract and documents.

  • Documents are delayed

    ESF + ETTN are prepared manually after loading; errors lead to reissued documents.

How the loss is calculated

Penalty risknumber of late contracts × applicable penalty per contract (UZS)
Truck waitingwaiting hours per truck per day (h/day) × number of trucks × cost per hour (UZS/h)
Late tonnestonnes loaded after the deadline (t) × price (UZS/t)
Document errorsnumber of reissued documents × time spent per document (h)

Calculate with your data

Monthly Cost of Truck Waiting in the Loading Queue

This calculator estimates one type of loss in loading exchange-traded goods: trucks waiting from gate entry to gate exit.

Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.

Values stay in this page and are not sent to the server.

Scenario estimate

0 / 5 values entered

Enter your operating figures to see the estimate.

This is not a guaranteed saving. Measure waiting time from queue logs or camera records. Enter as the hourly cost only what the enterprise actually pays: contractual waiting charges, idle cost of its own fleet or other documented costs. The target waiting time is your own assumption, and achieving it is not guaranteed. The calculation excludes exchange penalties, late loading, possible lost sales, document errors, equipment repairs and implementation costs. Do not add those losses to this result. Exchange rules and government regulations are not taken into account.

Formulas and assumptions

This calculator estimates one type of loss in loading exchange-traded goods: trucks waiting from gate entry to gate exit. The estimate covers one month. It is based on waiting time, the number of trucks per day and the waiting cost per truck-hour that your enterprise actually pays. A comparison scenario is calculated from a target waiting time that you enter. Penalties, late-loaded tonnes and document rework are not included. All results are estimates.

Current waiting cost
Trucks per day × current waiting time (minutes) ÷ 60 × hourly cost (currency/hour) × loading days per month. The result is in currency per month.
Waiting cost at target waiting time (estimate)
Trucks per day × target waiting time (minutes) ÷ 60 × hourly cost (currency/hour) × loading days per month. The number of trucks and the hourly cost are assumed to stay the same.
Difference between current and target cases
The target-case waiting cost is subtracted from the current monthly waiting cost (currency/month). A negative result is shown as 0. This is an estimated difference, not a guaranteed saving. Implementation costs are not deducted.

Facts and global practice

  • Presidential Decree (UP-269)

    At least 50% of cement must be sold through the exchange; the requirement applies until 01.01.2028.3

  • Competition Committee

    A large cement plant was penalised for failing to load on time under contracts concluded at exchange trading; the appeals board upheld the decision without change.4

  • Anhor.uz

    A UZS 4.9 billion penalty was imposed on one plant for bypassing exchange trading.1

  • UzRTSB

    On 1–7.12.2025, 423,094 t of cement was offered on the exchange and 112,491 t (26.6%) was sold.2

  • Anhor.uz (Uzpromstroymateriallar)

    In 2024, industry capacity utilisation did not exceed 46%.1

  • Norma (buxgalter.uz)

    The combined ESF and ETTN document is issued through electronic document operators.5

The cement market is oversupplied: exchange offers exceed sales. In these conditions, on-time loading and correct documents are what retain buyer trust.

One chain from contract to document

The exchange contract enters the system, the truck is booked into the queue, the weighbridge links the weight to the contract and the document is generated automatically.

  1. 01Contract
    • Exchange contract
    • Volume and deadline
    • Buyer
  2. 02Queue
    • Truck and driver
    • Entry time
    • Gate
  3. 03Loading
    • Truck weighbridge
    • Camera
    • Loading order
  4. 04Document
    • ESF + ETTN
    • 1C
    • Remaining volume report

Modules

The current maturity level is shown next to each module.

Exchange contracts and dispatch planRemaining volume, deadlines, alertsEngineering capability
Queue and gateTruck registration and call-inEngineering capability
Truck weighbridge integrationWeight, camera image and contract in one recordEngineering capability
ESF + ETTN and 1C exchangeDocuments generated from loading dataCommercially available

How we start

  1. 01

    Dispatch audit

    Review of the contract, queue, weighbridge and documentation process.

    Outcome: map of break points.

  2. 02

    Pilot at one gate

    One gate and one weighbridge for 30 days.

    Outcome: remaining volume report by contract.

  3. 03

    Scale-up

    All gates and loading points.

    Outcome: entire dispatch process in the system.

  4. 04

    Subscription

    Monthly reporting and support.

    Outcome: deadline and waiting time trends.

What is measured

On-time loadingShare of contracts loaded by the deadlineSystem
Waiting timeFrom gate entry to exitQueue, camera
Remaining volume accuracyDifference between system and accountingSystem, 1C
Document timeFrom weighing to ESF + ETTNSystem
Reissued documentsNumber of corrected documentsDocument log

What is needed to start

  • A person responsible for dispatch
  • List of exchange contracts
  • Weighbridge type and connectivity options
  • Test access to 1C

What we do not promise

  • Firm timeline and price without an audit
  • Exchange rules and government decisions
  • Repair of plant equipment
  • Unmeasured results or savings
  • Exchange trading results

Self-check

  1. Is the remaining volume under each exchange contract visible instantly?
  2. Is anyone alerted when a contract deadline is approaching?
  3. Is the truck queue known in advance?
  4. Is the weighing result automatically linked to the contract?
  5. Are the licence plate number and weight stored in one record?
  6. Is the time from loading to a completed ESF + ETTN recorded?
  7. Are documents being reissued?
  8. Does the 1C remaining balance match dispatch?
  9. Is truck waiting time at the gate known?
  10. Is there a person responsible for dispatch?

Dispatch audit

We review the chain from exchange contract to document and show where delays occur.

  • Map of break points
  • Pilot plan for one gate
  • Implementation fee and monthly subscription

Sources

  1. Anhor.uz, «Xitoy sement buumi: soha inqiroz yoqasida» (“Chinese cement boom: industry on the brink of crisis”), based on Uzpromstroymateriallar and statistical data, 04.02.2026.
  2. UzRTSB (Uzbek Republican Commodity Exchange) press release: cement trading on the exchange, 1–7.12.2025. uzsm.uz, 10.12.2025.
  3. Presidential Decree UP-269 of 20.12.2025 (extension of the exchange trading requirement). spot.uz, 09.01.2026.
  4. Decision of the Committee for the Development of Competition and Protection of Consumer Rights. spot.uz, 22.10.2026; uza.uz.
  5. «ESF va ETTN birlashtirilgan hujjatini rasmiylashtirish» (“Issuing the combined ESF and ETTN document”). buxgalter.uz (Norma), 11.08.2026.
  6. Meeting on the modernisation programme for building materials enterprises. anhor.uz, 2026.
  7. National Statistics Committee: cement production, January–July 2026. stat.uz, 2026.