Building materials · QM-08 · Digitising construction materials procurement
Delivered, confirmed, paid: in one chain.
In Europe, construction companies are digitising materials procurement from purchase order to invoice matching. In Uzbekistan, ESF (electronic invoice), ETTN (electronic consignment note) and the «Shaffof qurilish» (Transparent Construction) system provide the infrastructure for this.
Platform: Goods Flow
Materials suppliers connected to the platform in two years, according to Comstruct.1
Comstruct modules: ordering, digital delivery confirmation, invoice matching, ESG reporting.1
Construction work completed in January–September 2026, UZS.4
Paper waybills get lost. Electronic documents do not.
Who it is for
- Supply Director
- Procurement and suppliers.
- Site manager
- Receiving on site.
- Chief accountant
- ESF and matching.
- Finance
- Payment terms.
Where the problem lies
Orders via messenger
Quantities and prices stay in chat threads.
Paper-based receiving
Waybills signed on site reach the office late.
Manual matching
ESF, waybill and purchase order are matched by hand.
Discrepancies get lost
Short-delivered quantities remain on the invoice.
How the loss is calculated
| Short delivery | shortfall quantity × unit price |
|---|---|
| Matching time | documents per period × minutes per document ÷ 60 × hourly labour cost |
| Late payment | days late × daily penalty or lost discount per day |
| Duplicate payment | number of cases × amount per case |
Calculate with your data
Cost of Document Matching Time in Construction Materials Procurement
This calculator estimates the monthly cost of staff time spent manually matching purchase orders, delivery confirmations (delivery notes) and invoices.
Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.
Values stay in this page and are not sent to the server.
Scenario estimate
0 / 7 values entered
Enter your operating figures to see the estimate.
This is an estimate, not a promise or guarantee. It covers only the cost of staff time spent on matching. It excludes under-delivered quantities, late-payment penalties or lost early-payment discounts, duplicate payments, and implementation costs. Do not add those losses to this result. The target scenario values are your own assumptions, and achieving them is not guaranteed. Only measurements taken after implementation can show the actual outcome. No exact timeline or price can be given without an audit.
Formulas and assumptions
This calculator estimates the monthly cost of staff time spent manually matching purchase orders, delivery confirmations (delivery notes) and invoices. It compares two scenarios: your current state, based on values you have measured, and a target scenario you define yourself. It also accounts for the extra time needed to resolve documents with discrepancies. Enter all values from your own site data. The cost period is one month, and results are shown in currency units per month.
- Current state: monthly cost of matching time
- Sets per month × (minutes per set + discrepancy share % ÷ 100 × extra minutes) ÷ 60 × hourly cost. Result in currency per month.
- Target scenario: monthly cost of matching time
- Same calculation as the current state, but using your target minutes per set and discrepancy share. Result in currency per month. This is an assumption, not a guaranteed outcome.
- Monthly time-cost difference between scenarios
- Current-state cost − target-scenario cost; negative values are shown as 0. This is the estimated value of staff time that could be freed up. It is not guaranteed savings and does not account for implementation costs. Result in currency per month.
Facts and global practice
TechCrunch
Comstruct (Munich) is a construction materials procurement platform; it connected 800 suppliers in two years using ML.1
TechCrunch
The platform includes ordering, digital delivery confirmation, invoice matching and ESG reporting modules; pricing is per document.1
GlobalBIM (on «Shaffof qurilish»)
In Uzbekistan, construction contracts have been digitised since July 2024; contractors are financed only through electronic invoices.2
Norma (buxgalter.uz)
The combined ESF and ETTN document is issued through electronic document operators.3
National Statistics Committee
Construction work in January–September 2026 totalled UZS 339.3 trn, growth of 12.3%.4
Electronic documents are mandatory, but on-site receiving and matching often remain manual.
From order to payment
Orders are placed in the system, receipt on site is confirmed in a mobile app, ESF and ETTN are matched automatically, and discrepancies are flagged.
- 01Order
- Material, quantity
- Supplier
- Price
- 02Receiving
- Mobile confirmation
- Photo
- Actual quantity
- 03Matching
- ESF
- ETTN
- Order
- 04Payment
- Discrepancies
- Approval
- 1C
Modules
The current maturity level is shown next to each module.
| Orders and suppliers | Single list | Engineering capability |
|---|---|---|
| On-site receiving (mobile) | With quantity and photo | Engineering capability |
| ESF + ETTN matching | Automatic discrepancy detection | Commercially available |
| 1C integration | Payments and accounting | Commercially available |
How we start
- 01
Procurement audit
Order, receiving and document process.
Outcome: map of breaks in the chain.
- 02
Pilot on one site
30 days.
Outcome: discrepancy statistics.
- 03
Scale-up
All sites.
Outcome: complete chain.
- 04
Subscription
Monthly report.
Outcome: trend.
What is measured
| Confirmed receipts | Share | Mobile app |
|---|---|---|
| Document discrepancies | Cases and amount | System |
| Matching time | Per document | System |
| Payment term | Days | 1C |
What is needed to start
- Head of Supply
- Supplier list
- Site list
- Access to 1C and the EDO (electronic document exchange) operator
What we do not promise
- Firm timeline and price without an audit
- Exchange rules and government decisions
- Plant equipment repair
- Unmeasured results or savings
- Replicating results claimed by vendors
Self-check
- Are all orders kept in one system?
- Is on-site receipt confirmed with the actual quantity?
- Are ESF and ETTN matched against the purchase order?
- Are short-delivery cases visible?
- Is the time taken to complete matching, in days, recorded?
- Is there a supplier rating?
- Are payments made only after confirmed receipt?
- Have any paper waybills been lost?
- Are documents posted to 1C automatically?
- Is there a designated person responsible?
Procurement audit
We review the chain from order to payment and show where discrepancies are being lost.
- Map of breaks in the chain
- Pilot on one site
- Implementation fee and monthly subscription
Other solutions in this industry
- QM-01From exchange contract to loading
- QM-02Energy consumption and cost per tonne
- QM-03Batch and quality passport
- QM-04AI-based kiln control
- QM-05Advanced control of mills and raw mix
- QM-06Predictive maintenance
- QM-07Ready-mix concrete dispatching
- QM-09Carbon and emissions accounting
- QM-10Alternative fuel and fuel blend management
Sources
- «Comstruct, a platform to digitize the construction industry, raises $13.5 million». TechCrunch, 06.02.2025.
- «Corruption-free construction – Shaffof Qurilish system». globalbim.org.
- «ESF va ETTN birlashtirilgan hujjatini rasmiylashtirish» (in Uzbek: Issuing the combined ESF and ETTN document). buxgalter.uz (Norma), 11.08.2026.
- National Statistics Committee: construction work, January–September 2026. stat.uz.