Building materials · QM-02 · Energy consumption and cost per tonne
The market sets the price. The plant sets the cost.
In a market where capacity exceeds demand, a plant cannot control its selling price. What remains in its hands is the gas, electricity and downtime spent per tonne. These cannot be managed without measurement.
Platform: Plant Pulse
According to Anhor.uz, cement capacity utilisation did not exceed this level in 2024.1
Large enterprises that have undergone an energy audit; they account for roughly 65% of the sector's electricity consumption.2
Interest compensation on loans for replacing energy-intensive kilns and mills (UZS / foreign currency).2
An energy audit is done once. Consumption changes every shift.
Who it is for
- CEO
- Cost per tonne and profitability.
- Chief Engineer
- Kiln and mill operating modes.
- Chief Power Engineer
- Gas and electricity consumption.
- CFO
- Energy costs and loans.
Where the problem lies
Single plant meter
Gas and electricity are a single figure for the whole plant, not broken down by area.
Shifts are invisible
The same product consumes different amounts on different shifts, and the cause is not identified.
Downtime is not accounted for
Fuel consumed when a kiln stops and is restarted is not counted separately.
The audit stays on paper
Whether energy audit recommendations are implemented and deliver results is not tracked.
How the loss is calculated
| Specific consumption | (actual m³/t − best-shift m³/t) × tonnes × gas price per m³ |
|---|---|
| Downtime | downtime hours × hourly output (t/h) × margin per tonne |
| Electricity | (actual kWh/t − norm kWh/t) × tonnes × tariff per kWh |
| Restarts | number of restarts × consumption per restart |
Calculate with your data
Specific Gas Consumption: Cost of Excess Gas per Tonne
This calculator estimates gas cost for one furnace or section over a single period you choose (shift, month or other).
Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.
Values stay in this page and are not sent to the server.
Scenario estimate
0 / 4 values entered
Enter your operating figures to see the estimate.
The calculation covers gas cost only. It excludes electricity, margin lost to downtime, restart consumption, repairs and investment costs. These are different kinds of loss and are not added to this result. Reaching the reference consumption is not guaranteed: it depends on raw material, load, equipment condition and gas supply, and must be confirmed by an audit and by measurement. Tonnes, consumption and price must all refer to the same period and the same section. Gas prices and tariffs can change, so use the price on your current invoice.
Formulas and assumptions
This calculator estimates gas cost for one furnace or section over a single period you choose (shift, month or other). It compares your metered actual specific consumption (m³/t) with a reference value you set yourself, for example your best measured shift. You enter all values from your own meters, logs and 1C data. Results are estimates, not promises.
- Gas cost at actual consumption
- Tonnes × actual consumption (m³/t) × gas price (UZS/m³) = gas cost for the chosen period, in UZS.
- Gas cost at reference consumption
- Tonnes × reference consumption (m³/t) × gas price (UZS/m³). This is the gas cost if the same output were produced at the reference consumption; it is not a forecast.
- Gas cost above reference
- max(actual − reference consumption, 0) (m³/t) × tonnes × gas price (UZS/m³). The result is 0 if actual consumption is below the reference. This is an estimate based on the measured gap, not a saving.
- Gas volume above reference
- max(actual − reference consumption, 0) (m³/t) × tonnes = gas volume used above the reference in the period, in m³.
Facts and global practice
Anhor.uz (Uzpromstroymateriallar)
Design capacity of cement plants is 40.5 million t; output in 2024 was 17.9 million t; capacity utilisation did not exceed 46%.1
Anhor.uz
The exchange price fell to approximately $47 per tonne in January 2026.1
Modernisation programme
Energy audits have been carried out at 34 large enterprises, saving 240 million kWh last year; audits are planned at another 38 enterprises.2
Presidential decree
From 2026, UZS 100 billion will be allocated annually for AI, digital systems, automation and energy audits in building materials production.3
Ministry of Energy
In winter 2025–2026, the gas shortfall reached approximately 6 million m³ per day.4
Ministry of Energy
A brick plant was disconnected from gas during the winter restriction period; a criminal case was opened over illegal reconnection.5
Energy costs and supply risks persist. Meanwhile, the state is funding energy audits and digitalisation — a good time to introduce a measurement system.
Consumption for every tonne
Data is collected automatically from meters and linked to production volume. The result: cost per tonne by kiln, mill and shift.
- 01Measurement
- Gas meters
- Electricity meters
- Production volume
- 02Linking
- Kiln and mill
- Shift
- Product type
- 03Analysis
- m³/t and kWh/t
- Downtime
- Best shift
- 04Management
- Cost dashboard
- Audit recommendations
- Monthly report
Modules
The current maturity level is shown next to each module.
| Meter data collection | Existing and new meters (via a partner) | Engineering capability |
|---|---|---|
| Cost dashboard | By shift, day and tonne | Engineering capability |
| Tracking energy audit recommendations | Action, deadline, result | Engineering capability |
| 1C integration | Production and cost data | Commercially available |
How we start
- 01
Energy audit
Meters, production areas and available data are reviewed.
Outcome: measurement map.
- 02
Pilot on one line
One kiln or mill for 60 days.
Outcome: consumption by shift.
- 03
Scale-up
All production areas.
Outcome: plant-wide cost per tonne.
- 04
Subscription
Monthly report, recommendation tracking.
Outcome: consumption trend.
What is measured
| Gas consumption | m³ per tonne, by kiln | Meter |
|---|---|---|
| Electricity consumption | kWh per tonne, by area | Meter |
| Downtime | Hours and cause | Log |
| Cost per tonne | Energy component, UZS/t | System, 1C |
| Audit actions | Completed / planned | System |
What is needed to start
- Chief Power Engineer or responsible person
- List of meters
- Energy audit report (if available)
- Production report
What we do not promise
- Exact timeline and price without an audit
- Exchange rules and government decisions
- Repair of plant equipment
- Unmeasured results or savings
- Gas supply
- Energy tariff
Self-check
- Is gas consumption measured separately for each kiln?
- Is electricity consumption visible by production area?
- Is consumption per tonne calculated every shift?
- Are the best and worst shifts known?
- Is downtime recorded with its cause?
- Is restart consumption calculated?
- Is implementation of energy audit recommendations tracked?
- Is cost per tonne visible without waiting for month-end?
- Has it been calculated in advance which line would stop under a gas restriction?
- Is there a person responsible for energy?
Energy audit
We review meters and production data and show where cost per tonne can be measured.
- Measurement map
- Pilot plan for one line
- Implementation fee and monthly subscription
Other solutions in this industry
- QM-01From exchange contract to loading
- QM-03Batch and quality passport
- QM-04AI-based kiln control
- QM-05Advanced control of mills and raw mix
- QM-06Predictive maintenance
- QM-07Ready-mix concrete dispatching
- QM-08Digitising construction materials procurement
- QM-09Carbon and emissions accounting
- QM-10Alternative fuel and fuel blend management
Sources
- Anhor.uz, «Xitoy sement buumi: soha inqiroz yoqasida» (China's cement boom: the sector on the brink of crisis; based on Uzpromstroymateriallar and statistics data), 04.02.2026.
- Meeting on the modernisation programme for building materials enterprises. anhor.uz, 2026.
- Presidential decree on developing the building materials industry (PQ-365). spot.uz, 03.12.2025; buxgalter.uz.
- Ministry of Energy data: winter 2025–2026 gas restrictions. spot.uz, 26.02.2026.
- Ministry of Energy statement: illegal gas connection by a brick plant. anhor.uz.