Building materials · QM-09 · Carbon and emissions accounting
Carbon is now on the invoice.
On 1 January 2026, the EU CBAM entered its definitive phase: cement importers buy certificates for the emissions embedded in the product. Uzbekistan's first systematic emissions assessment for the cement sector was presented in April 2026.
Platform: Plant Pulse
Who it is for
- CEO
- Exports and investors.
- Environmental officer
- Reporting and limits.
- Chief power engineer
- Fuel consumption.
- Export department
- Customer requirements.
Where the problem lies
Fuel recorded only as a total
Fuel consumption is not recorded separately for each kiln.
Clinker ratio
The clinker ratio is not calculated for each cement grade.
Electricity
Electricity consumption is not separated out for indirect emissions.
Manual reporting
The annual report is compiled once, in Excel.
How the loss is calculated
| Export opportunity | contracts lost because the required report was not available |
|---|---|
| Certificate cost | emissions (t CO₂) × certificate price (per t CO₂; borne on the importer's side) |
| Default values | difference when default values are used instead of actual values |
| Reporting time | days spent × specialist cost per day |
Calculate with your data
CBAM certificate cost: default vs actual emission values
This calculator estimates the CBAM certificate cost that an EU importer would bear for the embedded emissions in the product you export.
Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.
Values stay in this page and are not sent to the server.
Scenario estimate
0 / 5 values entered
Enter your operating figures to see the estimate.
This is not legal advice. Whether actual values can be used depends on the CBAM rules, data completeness and verification. The calculator does not guarantee any of these. The certificate price, the default values and the share subject to payment change with regulatory and market decisions. Take them from official sources or from your importer and adviser. The certificate cost is paid by the importer, not by the plant. How far the difference affects your price or contract depends on negotiation. Do not add this result to other loss types such as lost contracts or reporting time.
Formulas and assumptions
This calculator estimates the CBAM certificate cost that an EU importer would bear for the embedded emissions in the product you export. It compares two cases over the same period (one year) and in the same currency. In the first case the importer applies the default emission value. In the second case the plant's measured actual specific emissions are applied. You enter every value yourself: volume, default value, actual value, certificate price and the share subject to payment. NOT included: lost export contracts, specialist time for reporting, verification and system costs, exchange rates and equipment repairs. The result is an estimate of cost exposure. It is not a guaranteed saving.
- Annual certificate cost using default value (importer side)
- Export volume (t/year) × default emission value (t CO₂/t) × certificate price (currency/t CO₂) × covered share (% ÷ 100).
- Annual certificate cost using measured actual value (importer side)
- Export volume (t/year) × actual specific emissions (t CO₂/t) × certificate price (currency/t CO₂) × covered share (% ÷ 100). Applies only if the actual value is accepted.
- Additional cost exposure from using the default value
- Export volume (t/year) × (default value − actual value, t CO₂/t) × certificate price (currency/t CO₂) × covered share (% ÷ 100). If the actual value is higher than the default value, the result is shown as 0. In that case compare both costs above.
Facts and global practice
PwC, CMS
CBAM has been in its definitive phase since 01.01.2026; importers buy and surrender certificates for the emissions embedded in products; cement is on the CBAM list.1
PwC, CMS
Certificates for 2026 imports go on sale from 01.02.2027; declarations are annual.1
Global Cement
Uzbekistan presented its first systematic greenhouse gas assessment for the cement sector in April 2026.2
kun.uz (statistics)
In the first 9 months of 2025, cement exports were approximately 1.1 Mt, worth $44.4 million; main buyer: Kyrgyzstan.3
Today almost no Uzbek cement goes to Europe, so CBAM has no direct impact. But investors, international financial institutions and future export markets ask for the same figure.
From fuel to report
MEENTAKA collects fuel, electricity, production and clinker data and maintains the emissions calculation automatically. Verification is carried out by an accredited body.
- 01Data
- Fuel
- Electricity
- Production
- 02Calculation
- Clinker ratio
- Emission factors
- Product
- 03Reporting
- Monthly
- Annual
- Customer request
- 04Verification
- Audit trail
- Documents
- Verifier
Modules
The current maturity level is shown next to each module.
| Fuel and electricity data | From meters | Engineering capability |
|---|---|---|
| Emissions calculation | By factor | In development |
| Reporting and audit trail | For customers and verifiers | In development |
| 1C integration | Production volume | Commercially available |
How we start
- 01
Data audit
What data is available.
Outcome: gap map.
- 02
Baseline calculation
Based on one year of data.
Outcome: emissions per tonne.
- 03
Automated calculation
Monthly update.
Outcome: continuous figure.
- 04
Subscription
Reporting service.
Outcome: trend.
What is measured
| Emissions per tonne | t CO₂ / t product | System |
|---|---|---|
| Clinker ratio | By grade | Laboratory |
| Data completeness | Share | System |
| Reporting time | Days | System |
What is needed to start
- Environmental officer or responsible person
- Fuel and electricity records
- Production report
- Laboratory data
What we do not promise
- Exact timeline and price without an audit
- Exchange rules and government decisions
- Repair of plant equipment
- Unmeasured results or savings
- Verification and certification
- Legal advice on CBAM
Self-check
- Is fuel consumption per kiln known?
- Is the clinker ratio calculated for each grade?
- Is electricity consumption separated out?
- Is there an emissions-per-tonne figure?
- Is the report updated monthly?
- Is your response time (in days) to a customer request known?
- Are the source documents for the calculation retained?
- Have international financial institutions asked for the figure?
- Is the alternative fuel share calculated?
- Is there a designated responsible person?
Emissions audit
We review your existing data and show how emissions per tonne can be calculated.
- Gap map
- Baseline calculation plan
- Implementation fee and monthly subscription
Other solutions in this industry
- QM-01From exchange contract to loading
- QM-02Energy consumption and cost per tonne
- QM-03Batch and quality passport
- QM-04AI-based kiln control
- QM-05Advanced control of mills and raw mix
- QM-06Predictive maintenance
- QM-07Ready-mix concrete dispatching
- QM-08Digitising construction materials procurement
- QM-10Alternative fuel and fuel blend management
Sources
- PwC: «CBAM in focus: preparing for the definitive regime»; CMS: «EU CBAM: what's new». 2026.
- Global Cement: «Update on Central Asia: June 2026». globalcement.com.
- «Uzbekistan's cement exports surge, Kyrgyzstan emerges as main buyer». kun.uz, 13.11.2025.