Building materials · QM-05 · Advanced control of mills and raw mix
Every kWh ends up in the cost per tonne.
Advanced process control (APC) stabilises the mill and the raw mix. Such systems run on hundreds of lines worldwide, but they require accurate measurement and a data history.
Platform: Plant Pulse
Cement lines using Expert Optimizer, according to ABB.1
FLSmidth case study: energy reduction on the raw mill at the Çimentaş İzmir plant.3
ABB brochure: reduction in electricity consumption (vendor claim).2
APC optimises a stable process. An unstable process must be measured first.
Who it is for
- CEO
- Electricity cost.
- Chief Technologist
- Fineness and quality.
- Chief Power Engineer
- kWh/t.
- Mill Supervisor
- Operating mode and stoppages.
Where the problem lies
Shared meter
Mill consumption is not metered separately.
Fineness data lags
Laboratory results arrive hours late.
Stoppages
Causes of minor stoppages are not recorded.
No baseline
There is no reference point against which to compare improvements.
How the loss is calculated
| Electricity | (actual kWh/t − best-shift kWh/t) × tonnes produced in the period × tariff per kWh |
|---|---|
| Downtime | downtime hours × output per hour (t/h) × margin per tonne |
| Over-grinding | share of over-grinding × grinding electricity cost for the same period (kWh × tariff per kWh) |
| Rework | off-spec tonnes × production cost per tonne |
Calculate with your data
Mill Electricity: Gap Between Actual and Chosen Target kWh/t
This calculator estimates the electricity cost of a cement or raw mill over a period you choose.
Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.
Values stay in this page and are not sent to the server.
Scenario estimate
0 / 4 values entered
Enter your operating figures to see the estimate.
The best shift may reflect different conditions: clinker or raw material composition, moisture, fineness requirement, product type or load. The target is therefore not assumed to be sustainably attainable. The calculation excludes downtime, overgrinding, rework of off-spec product, demand (capacity) charges, taxes, and APC system and implementation costs. Do not add these other loss types to the electricity result. This is not a payback calculation. Exact timelines and prices require an audit and measured results. Results claimed by suppliers may not be replicated at your plant.
Formulas and assumptions
This calculator estimates the electricity cost of a cement or raw mill over a period you choose. It compares the measured specific consumption (kWh/t) with a target value you select, for example the best shift recorded by your meters. You enter every value yourself: meter readings, tonnes ground in that period and your actual tariff. The cost period matches the period of the tonnes you enter (shift, month or year). Results are estimates only and do not guarantee any savings.
- Electricity cost at actual consumption
- Actual consumption (kWh/t) × tonnes in the period (t) × tariff (currency/kWh).
- Electricity cost at target consumption (scenario)
- Target consumption (kWh/t) × the same tonnes (t) × tariff (currency/kWh). This is a scenario, not an attainable result.
- Cost gap between actual and target consumption
- (Actual − target kWh/t, set to 0 if negative) × tonnes (t) × tariff (currency/kWh). This is an estimated cost exposure, not guaranteed savings.
- Energy gap between actual and target consumption
- (Actual − target kWh/t, set to 0 if negative) × tonnes (t). This is the cost gap expressed in kWh; do not add it to the monetary results.
Facts and global practice
ABB
ABB Expert Optimizer has been deployed on more than 200 cement production lines.1
ABB
ABB brochure: production up to 5% higher, fuel and electricity consumption up to 5% lower.2
FLSmidth / Pacpro
At the Çimentaş İzmir plant, FLSmidth ECS/ProcessExpert reduced raw mill energy consumption by up to 3.8%.3
ABB
CRH Group implemented Expert Optimizer at five plants in Western Europe, then at the Ozarow plant.4
Modernisation programme
An energy audit was carried out at 34 large building-materials enterprises in Uzbekistan, accounting for approximately 65% of the sector's electricity consumption.5
APC vendors present results based on their own customers' cases. A plant in Uzbekistan must first measure its own baseline.
Measure first, then optimise
MEENTAKA links electricity, production and laboratory data for each mill and builds a baseline. The APC system is implemented by a specialised vendor.
- 01Measurement
- Mill meter
- Scale / feeder
- Laboratory
- 02Linking
- Shift
- Product type
- Stoppage
- 03Baseline
- kWh/t
- Best shift
- Gap
- 04Next step
- APC partner
- Production cost
- Report
Modules
The current maturity level is shown next to each module.
| Electricity metering per mill | Meters (via partner) | Engineering capability |
|---|---|---|
| Linking by shift and product | Production accounting | Engineering capability |
| Baseline report | Gap versus best shift | Engineering capability |
| Integration with APC partner | Data transfer | In development |
How we start
- 01
Measurement audit
Meters and feeders.
Outcome: measurement map.
- 02
Baseline
60 days of data.
Outcome: kWh/t and gaps.
- 03
Pilot with partner
APC vendor trial.
Outcome: measurable result.
- 04
Subscription
Monthly report.
Outcome: consumption trend.
What is measured
| Electricity consumption | kWh/t | Meter |
|---|---|---|
| Shift-to-shift gap | Best and average | System |
| Stoppages | Hours and cause | Log |
| Fineness | Laboratory result | Laboratory |
What is needed to start
- Chief Power Engineer
- List of mills
- Laboratory log
- Production report
What we do not promise
- Fixed timelines and prices without an audit
- Commodity exchange rules and government decisions
- Repair of plant equipment
- Unmeasured results or savings
- Replicating results announced by vendors
Self-check
- Is consumption of each mill metered separately?
- Is kWh/t calculated for every shift?
- Is the best shift known?
- Is the turnaround time for fineness results known?
- Are stoppages recorded with their causes?
- Are feeders calibrated?
- Is there a baseline?
- Has there been a discussion with an APC vendor?
- Are electricity tariff changes visible in production cost?
- Is there a responsible person?
Mill audit
We establish measurement and a baseline for each mill and show readiness for APC.
- Baseline
- Pilot plan with a partner
- Implementation fee and monthly subscription
Other solutions in this industry
- QM-01From exchange contract to loading
- QM-02Energy consumption and cost per tonne
- QM-03Batch and quality passport
- QM-04AI-based kiln control
- QM-06Predictive maintenance
- QM-07Ready-mix concrete dispatching
- QM-08Digitising construction materials procurement
- QM-09Carbon and emissions accounting
- QM-10Alternative fuel and fuel blend management
Sources
- ABB: «Advanced process control with cpmPlus Expert Optimizer» (more than 200 cement lines). library.e.abb.com.
- ABB Ability Expert Optimizer for cement, brochure (ABB, 2019). Via manuals.plus.
- FLSmidth / Pacpro: «Advanced Process Control Implementation at Çimentaş İzmir», case study, 2022.
- ABB: «Expert Optimizer for energy efficiency at CRH Ozarow cement plant». new.abb.com.
- Meeting on the modernisation programme for building-materials enterprises. anhor.uz, 2026.