Building materials · QM-05 · Advanced control of mills and raw mix

Every kWh ends up in the cost per tonne.

Advanced process control (APC) stabilises the mill and the raw mix. Such systems run on hundreds of lines worldwide, but they require accurate measurement and a data history.

Platform: Plant Pulse

200+

Cement lines using Expert Optimizer, according to ABB.1

Up to 3.8%

FLSmidth case study: energy reduction on the raw mill at the Çimentaş İzmir plant.3

Up to 5%

ABB brochure: reduction in electricity consumption (vendor claim).2

APC optimises a stable process. An unstable process must be measured first.

Who it is for

CEO
Electricity cost.
Chief Technologist
Fineness and quality.
Chief Power Engineer
kWh/t.
Mill Supervisor
Operating mode and stoppages.

Where the problem lies

  • Shared meter

    Mill consumption is not metered separately.

  • Fineness data lags

    Laboratory results arrive hours late.

  • Stoppages

    Causes of minor stoppages are not recorded.

  • No baseline

    There is no reference point against which to compare improvements.

How the loss is calculated

Electricity(actual kWh/t − best-shift kWh/t) × tonnes produced in the period × tariff per kWh
Downtimedowntime hours × output per hour (t/h) × margin per tonne
Over-grindingshare of over-grinding × grinding electricity cost for the same period (kWh × tariff per kWh)
Reworkoff-spec tonnes × production cost per tonne

Calculate with your data

Mill Electricity: Gap Between Actual and Chosen Target kWh/t

This calculator estimates the electricity cost of a cement or raw mill over a period you choose.

Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.

Values stay in this page and are not sent to the server.

Scenario estimate

0 / 4 values entered

Enter your operating figures to see the estimate.

The best shift may reflect different conditions: clinker or raw material composition, moisture, fineness requirement, product type or load. The target is therefore not assumed to be sustainably attainable. The calculation excludes downtime, overgrinding, rework of off-spec product, demand (capacity) charges, taxes, and APC system and implementation costs. Do not add these other loss types to the electricity result. This is not a payback calculation. Exact timelines and prices require an audit and measured results. Results claimed by suppliers may not be replicated at your plant.

Formulas and assumptions

This calculator estimates the electricity cost of a cement or raw mill over a period you choose. It compares the measured specific consumption (kWh/t) with a target value you select, for example the best shift recorded by your meters. You enter every value yourself: meter readings, tonnes ground in that period and your actual tariff. The cost period matches the period of the tonnes you enter (shift, month or year). Results are estimates only and do not guarantee any savings.

Electricity cost at actual consumption
Actual consumption (kWh/t) × tonnes in the period (t) × tariff (currency/kWh).
Electricity cost at target consumption (scenario)
Target consumption (kWh/t) × the same tonnes (t) × tariff (currency/kWh). This is a scenario, not an attainable result.
Cost gap between actual and target consumption
(Actual − target kWh/t, set to 0 if negative) × tonnes (t) × tariff (currency/kWh). This is an estimated cost exposure, not guaranteed savings.
Energy gap between actual and target consumption
(Actual − target kWh/t, set to 0 if negative) × tonnes (t). This is the cost gap expressed in kWh; do not add it to the monetary results.

Facts and global practice

  • ABB

    ABB Expert Optimizer has been deployed on more than 200 cement production lines.1

  • ABB

    ABB brochure: production up to 5% higher, fuel and electricity consumption up to 5% lower.2

  • FLSmidth / Pacpro

    At the Çimentaş İzmir plant, FLSmidth ECS/ProcessExpert reduced raw mill energy consumption by up to 3.8%.3

  • ABB

    CRH Group implemented Expert Optimizer at five plants in Western Europe, then at the Ozarow plant.4

  • Modernisation programme

    An energy audit was carried out at 34 large building-materials enterprises in Uzbekistan, accounting for approximately 65% of the sector's electricity consumption.5

APC vendors present results based on their own customers' cases. A plant in Uzbekistan must first measure its own baseline.

Measure first, then optimise

MEENTAKA links electricity, production and laboratory data for each mill and builds a baseline. The APC system is implemented by a specialised vendor.

  1. 01Measurement
    • Mill meter
    • Scale / feeder
    • Laboratory
  2. 02Linking
    • Shift
    • Product type
    • Stoppage
  3. 03Baseline
    • kWh/t
    • Best shift
    • Gap
  4. 04Next step
    • APC partner
    • Production cost
    • Report

Modules

The current maturity level is shown next to each module.

Electricity metering per millMeters (via partner)Engineering capability
Linking by shift and productProduction accountingEngineering capability
Baseline reportGap versus best shiftEngineering capability
Integration with APC partnerData transferIn development

How we start

  1. 01

    Measurement audit

    Meters and feeders.

    Outcome: measurement map.

  2. 02

    Baseline

    60 days of data.

    Outcome: kWh/t and gaps.

  3. 03

    Pilot with partner

    APC vendor trial.

    Outcome: measurable result.

  4. 04

    Subscription

    Monthly report.

    Outcome: consumption trend.

What is measured

Electricity consumptionkWh/tMeter
Shift-to-shift gapBest and averageSystem
StoppagesHours and causeLog
FinenessLaboratory resultLaboratory

What is needed to start

  • Chief Power Engineer
  • List of mills
  • Laboratory log
  • Production report

What we do not promise

  • Fixed timelines and prices without an audit
  • Commodity exchange rules and government decisions
  • Repair of plant equipment
  • Unmeasured results or savings
  • Replicating results announced by vendors

Self-check

  1. Is consumption of each mill metered separately?
  2. Is kWh/t calculated for every shift?
  3. Is the best shift known?
  4. Is the turnaround time for fineness results known?
  5. Are stoppages recorded with their causes?
  6. Are feeders calibrated?
  7. Is there a baseline?
  8. Has there been a discussion with an APC vendor?
  9. Are electricity tariff changes visible in production cost?
  10. Is there a responsible person?

Mill audit

We establish measurement and a baseline for each mill and show readiness for APC.

  • Baseline
  • Pilot plan with a partner
  • Implementation fee and monthly subscription

Sources

  1. ABB: «Advanced process control with cpmPlus Expert Optimizer» (more than 200 cement lines). library.e.abb.com.
  2. ABB Ability Expert Optimizer for cement, brochure (ABB, 2019). Via manuals.plus.
  3. FLSmidth / Pacpro: «Advanced Process Control Implementation at Çimentaş İzmir», case study, 2022.
  4. ABB: «Expert Optimizer for energy efficiency at CRH Ozarow cement plant». new.abb.com.
  5. Meeting on the modernisation programme for building-materials enterprises. anhor.uz, 2026.