Building materials · QM-07 · Ready-mix concrete dispatching

Concrete does not wait.

Once ready-mix concrete leaves the plant, it has a limited usable time. Concrete producers worldwide are combining dispatching, GPS tracking and electronic delivery tickets in one system.

Platform: Plant Pulse

700+

Plants using the ConcreteGo dispatching system, according to Sysdyne.1

339.3 trn

Construction work completed in Uzbekistan, January–September 2026, UZS.3

+12.3%

Year-on-year growth in construction work.3

Empty trips, late truck mixers and returned concrete share one cause: the dispatcher lacks visibility.

Who it is for

Plant director
Truck mixer productivity.
Dispatcher
Orders and deliveries.
Laboratory
Mix design.
Finance
Invoicing.

Where the problem lies

  • Orders taken by phone

    Volume, grade and time are recorded by hand.

  • Truck mixers not visible

    Location of each truck is unknown.

  • Returned concrete

    Surplus or late concrete is not recorded.

  • Documents delayed

    Delivery tickets and invoices are prepared after delivery.

How the loss is calculated

Empty tripsempty trips per month × cost per trip, UZS
Waitingwaiting hours on site per month × truck mixer cost per hour, UZS
Returned concretereturned concrete, m³ per month × production cost per m³, UZS
Documentsdelayed invoices per month × payment delay, days

Calculate with your data

Truck Mixer Waiting Time at Site: Monthly Cost Calculator

This calculator estimates the monthly cost of time that truck mixers spend waiting at construction sites during ready-mix concrete deliveries.

Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.

Values stay in this page and are not sent to the server.

Scenario estimate

0 / 5 values entered

Enter your operating figures to see the estimate.

Results are estimates, not promises. You set the scenario waiting time yourself, and it is not presented as an achievable result. The calculated difference only shows the potential reduction in waiting cost. It does not automatically become a cash saving unless freed mixer time is actually redeployed or costs genuinely fall. In the mixer hour cost, include only costs that actually arise during waiting, such as driver pay, idling fuel and drum rotation. Penalties charged to customers, implementation costs, audits and other loss types are not included.

Formulas and assumptions

This calculator estimates the monthly cost of time that truck mixers spend waiting at construction sites during ready-mix concrete deliveries. Only waiting beyond the contractually agreed free unloading time is counted. You enter all values yourself: monthly deliveries, average waiting time per delivery (actual GPS or dispatch-system measurements), free time allowance and your own cost per mixer hour. The current situation is compared with a scenario you define, using the same period (one month) and the same currency. Empty trips, returned concrete, invoicing delays and margin lost on additional trips are excluded.

Current: cost of waiting beyond free time
Trips/month × max(current waiting minutes − free minutes; 0) ÷ 60 × mixer cost (currency/hour) = currency/month. Waiting shorter than the free time counts as zero.
Scenario: cost of waiting beyond free time
Trips/month × max(scenario waiting minutes − free minutes; 0) ÷ 60 × mixer cost (currency/hour) = currency/month. Trip count and hourly cost are the same as in the current case.
Potential reduction in waiting cost (estimate)
Current cost − scenario cost (currency/month). A negative result is shown as zero. This is an estimate, not a guaranteed saving.

Facts and global practice

  • Sysdyne (company information)

    Sysdyne offers cloud dispatching, remote batching control, GPS tracking and electronic delivery ticket modules; ConcreteGo is used at more than 700 plants.1

  • Startupresearcher

    In 2026, XBE received growth investment from PSG and released a simulation and optimisation solution for ready-mix concrete dispatching.2

  • Startupresearcher (on XBE)

    A poor dispatching decision leads to idle truck mixers, late deliveries, idle site crews and wasted fuel.2

  • National Statistics Committee

    In January–September 2026, construction work in Uzbekistan totalled UZS 339.3 trillion, up 12.3%.3

No public data was found on dispatching losses at concrete plants in Uzbekistan. This document describes international practice; the local situation is determined through an audit.

One chain from order to acceptance

The order enters the system, the dispatcher schedules the truck mixer, the delivery ticket and ESF (electronic invoice) + ETTN (electronic consignment note) are generated automatically, and acceptance is confirmed on site.

  1. 01Order
    • Grade, volume
    • Time window
    • Job site
  2. 02Schedule
    • Truck mixers
    • Queue
    • Batching
  3. 03Delivery
    • GPS
    • Arrival time
    • Acceptance
  4. 04Documents
    • ESF + ETTN
    • 1C
    • Returned concrete

Modules

The current maturity level is shown next to each module.

Orders and dispatchingGrade, volume, timeIn development
Truck mixer trackingGPS via a partnerEngineering capability
ESF + ETTN and 1CAutomatic documentsCommercially available
Acceptance on siteMobile confirmationEngineering capability

How we start

  1. 01

    Dispatching audit

    Order and delivery process.

    Outcome: loss map.

  2. 02

    Pilot

    One plant, 30 days.

    Outcome: trip statistics.

  3. 03

    Scale-up

    All truck mixers.

    Outcome: full control.

  4. 04

    Subscription

    Monthly report.

    Outcome: trend.

What is measured

On-time deliveryShareGPS, system
Empty tripsTripsGPS
Returned concretem³System
Document timeFrom delivery to ESFSystem

What is needed to start

  • Dispatcher
  • Truck mixer list
  • Order log
  • Test access to 1C

What we do not promise

  • Exact timeline and price without an audit
  • Exchange rules and government decisions
  • Repair of plant equipment
  • Unmeasured results or savings
  • Replicating results announced by vendors

Self-check

  1. Are orders accepted in the system?
  2. Is the location of every truck mixer visible?
  3. Is the customer told the arrival time in advance?
  4. Is returned concrete recorded?
  5. Is the number of empty trips known?
  6. Are delivery tickets generated automatically?
  7. Are the ESF and ETTN ready on the day of delivery?
  8. Is acceptance confirmed on site?
  9. Is batching linked to the order?
  10. Is there a responsible person?

Dispatching audit

We review the process from order to acceptance and show where truck mixer time is being lost.

  • Loss map
  • Pilot plan
  • Implementation fee and monthly subscription

Sources

  1. Sysdyne Technologies profile (based on company information). datadrivenaec.com, 2026.
  2. «XBE secures PSG growth investment». startupresearcher.com, 22.08.2026.
  3. National Statistics Committee: construction work, January–September 2026. stat.uz.