Building materials · QM-06 · Predictive maintenance

Unplanned downtime is the most expensive hour.

Cement plants worldwide are moving to equipment condition monitoring through digital twins and analytics. Vendors are announcing significant results, but these have not been independently verified.

Platform: Plant Pulse

820 → 740

Visionaize press release: heat consumption in kcal/kg at a plant in South Asia (company statement).1

250+

Process variables connected to the AI platform in this project.1

17

Idle cement plants in Uzbekistan (modernisation programme data).2

Equipment gives a signal before it stops. That signal needs to be recorded.

Who it is for

Chief mechanical engineer
Equipment condition.
CEO
Cost of downtime.
Procurement
Spare parts.
Chief process engineer
Operating mode.

Where the problem lies

  • Paper logbook

    Repair history is not analysed.

  • Cause not recorded

    Downtime duration is logged, but not the cause.

  • Spare parts

    A required part missing from the warehouse prolongs downtime.

  • Signals not monitored

    Vibration and temperature trends are not reviewed.

How the loss is calculated

Downtimeunplanned downtime hours per month × hourly output (t/h) × margin per tonne
Restartsnumber of restarts per month × fuel cost per restart
Spare partsrush-purchase premium per case × number of cases per month
Refractory liningpremature replacements per year × cost per replacement

Calculate with your data

Lost Contribution Margin from Unplanned Kiln and Mill Downtime

This calculator estimates the contribution margin lost in one month because of unplanned kiln or mill downtime.

Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.

Values stay in this page and are not sent to the server.

Scenario estimate

0 / 5 values entered

Enter your operating figures to see the estimate.

These results are estimates, not promised savings. The following costs are excluded: restart fuel, rush-purchase premiums for spare parts, premature refractory lining replacement, repair work, and the cost of implementing predictive maintenance. Calculate those losses separately and do not add them to this result. If lost output can be recovered later through extra shifts or from stock, reduce the non-recoverable share accordingly. No specific outcomes or timelines are promised without an audit and measured data.

Formulas and assumptions

This calculator estimates the contribution margin lost in one month because of unplanned kiln or mill downtime. The estimate covers only output that cannot be recovered later. You enter all values yourself: actual downtime hours from the downtime log, the equipment's hourly throughput, and the contribution margin per unit of output. Enter contribution margin, not revenue. The comparison against your own target for downtime hours is a scenario only. It is not an attainable or guaranteed result. Period: one month.

Lost margin, current state
Actual unplanned downtime (h/month) × hourly throughput (units/h) × contribution margin per unit (currency/unit) × non-recoverable share (%) ÷ 100.
Lost margin, scenario
Target unplanned downtime (h/month) × hourly throughput (units/h) × contribution margin per unit (currency/unit) × non-recoverable share (%) ÷ 100. This is only your own scenario, not an attainable result.
Difference between current state and scenario
Scenario lost margin is subtracted from current-state lost margin (currency/month). If the result is negative, 0 is shown. This is a potential difference under the scenario, not guaranteed savings. Implementation costs are not deducted.

Facts and global practice

  • Visionaize (press release)

    Visionaize connected more than 250 DCS and SCADA variables to an AI platform at a cement plant in South Asia.1

  • Visionaize (press release)

    According to the company statement, heat consumption fell from 820 to 740 kcal/kg, mill and kiln stoppages fell by 60%, and refractory lining service life increased by 50%.1

  • ABB (FICEM 2026)

    ABB's cement portfolio includes Downtime Management and LIMS modules.3

  • Modernisation programme

    17 cement plants in Uzbekistan are idle; energy audits have been carried out at 34 large enterprises.2

These figures are vendor statements, not an independent audit. They indicate direction only.

From downtime records to predictive maintenance

The first step is to record every stoppage with its cause and link spare parts to the warehouse. Then monitor signal trends.

  1. 01Logbook
    • Stoppage
    • Cause
    • Duration
  2. 02Warehouse
    • Spare part
    • Stock
    • Order
  3. 03Signal
    • Temperature
    • Vibration
    • Current
  4. 04Analysis
    • Recurring cause
    • Plan
    • Report

Modules

The current maturity level is shown next to each module.

Downtime logCause and durationEngineering capability
Spare parts warehouse (WMS)Stock and locationCommercially available
Signal trendsFrom existing sensorsEngineering capability
Predictive analyticsWith a partnerIn development

How we start

  1. 01

    Maintenance audit

    Logbook and warehouse are reviewed.

    Outcome: downtime map.

  2. 02

    Logbook and warehouse

    60 days on one line.

    Outcome: cause statistics.

  3. 03

    Signal trends

    Key equipment.

    Outcome: early warning.

  4. 04

    Subscription

    Monthly report.

    Outcome: downtime trend.

What is measured

Unplanned downtimeHours per monthLogbook
Recurring causeShare of a single causeLogbook
Spare part unavailableCasesWMS
Repair timeHoursLogbook

What is needed to start

  • Chief mechanical engineer
  • Equipment list
  • Spare parts list
  • Existing sensors

What we do not promise

  • Fixed timeline and price without an audit
  • Exchange rules and government decisions
  • Repair of plant equipment
  • Unmeasured results or savings
  • Replicating results announced by vendors

Self-check

  1. Is every stoppage recorded with its cause?
  2. Is there a list of recurring failures?
  3. Is spare parts stock held in a system?
  4. Is a minimum stock level set for critical parts?
  5. Are vibration or temperature trends monitored?
  6. Is refractory lining service life calculated?
  7. Is restart consumption accounted for?
  8. Is the maintenance plan based on data?
  9. Is equipment history stored in one place?
  10. Is there a responsible person?

Maintenance audit

We review downtime and spare parts records and show where unplanned stoppages are coming from.

  • Downtime map
  • Pilot plan
  • Implementation fee and monthly subscription

Sources

  1. Visionaize Inc. press release: AI and digital twin in cement production. newswire.com, 21.10.2026.
  2. Meeting on the modernisation programme for building materials enterprises. anhor.uz, 2026.
  3. ABB: FICEM 2026 presentation (LIMS Quality Management, Downtime Management, EMS). ficem.org, 2026.