Building materials · QM-04 · AI-based kiln control
AI can run the kiln, but not without data.
Leading cement groups are introducing AI-assisted control of the kiln and preheater tower. In Uzbekistan, with gas supply constrained, fuel remains a major share of production cost.
Platform: Plant Pulse
Reduction in specific heat consumption at Carbon Re (Gigaton) customers, according to the company.1
Investment raised by Gigaton (formerly Carbon Re) in 2026.3
Daily gas shortfall in winter 2025–2026, according to the Ministry of Energy.4
A plant that does not collect data has nothing for AI to learn from.
Who it is for
- CEO
- Fuel costs.
- Chief Process Engineer
- Kiln operation and clinker quality.
- Chief Power Engineer
- Gas and heat consumption.
- Head of IT
- Data and integration.
Where the problem lies
No archive
DCS data is not stored, or is stored only briefly.
Laboratory kept separate
Clinker analysis is not linked to process data.
Fuel metered only in total
Gas and coal consumption is not measured separately per kiln.
No access for vendors
There is no secure way to transfer data.
How the loss is calculated
| Fuel | heat consumption gap (kcal/kg clinker) × clinker output (t per year) × fuel cost per unit of heat |
|---|---|
| Instability | process upset hours (h per year) × hourly output (t/h, valued at cost per t) |
| Quality | reprocessed clinker (t per year) × cost per tonne |
| Delay | months of delay in AI deployment × potential savings per month |
Calculate with your data
Kiln fuel: measured specific heat consumption vs. your own target scenario
This calculator estimates kiln fuel cost for one period you choose, for example a month or a year.
Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.
Values stay in this page and are not sent to the server.
Scenario estimate
0 / 5 values entered
Enter your operating figures to see the estimate.
All results are estimates, not promises. The target heat consumption is set by you and is not presented as achievable. No AI system is assumed to guarantee any result. The difference only shows the possible fuel effect if that target were actually reached. Use meter and laboratory data for heat consumption, and check signal completeness. If several fuels are used, enter a weighted average calorific value and price. Vendor-claimed results, exact timelines and prices are not assessed without an audit.
Formulas and assumptions
This calculator estimates kiln fuel cost for one period you choose, for example a month or a year. It uses measured specific heat consumption (kcal/kg clinker), clinker output for that period, the fuel's net calorific value and the fuel price. It shows the baseline cost, the cost at a target heat consumption you enter, and the difference between them. Only fuel cost is covered. Process instability, quality losses (reprocessed clinker), implementation delay, electricity, repairs and the cost of an AI system are excluded. These loss types are not added together.
- Baseline fuel cost
- Actual heat consumption (kcal/kg) × clinker (t) × 1000 (kg/t) ÷ net calorific value (kcal/unit) × fuel price (currency/unit). The result applies to the chosen period.
- Fuel cost in target scenario
- Target heat consumption (kcal/kg) × clinker (t) × 1000 (kg/t) ÷ net calorific value (kcal/unit) × fuel price. Output and price are assumed unchanged. This is a scenario you entered, not a forecast.
- Difference between baseline and target cost
- (Actual − target heat consumption, not below 0) (kcal/kg) × clinker (t) × 1000 ÷ net calorific value × fuel price. This is the possible fuel effect if the target were reached, not guaranteed savings. Implementation costs are not deducted.
Facts and global practice
Carbon Re (partner content)
At customers using Carbon Re AI process control, specific heat consumption fell by 5.4% and the alternative fuel share rose by 3.8%.1
Innovate UK
In 2024, the Carbon Re platform was deployed at Heidelberg Materials' Mokrá plant in the Czech Republic; the plant reduced its fuel costs.2
Cemnet
Gigaton (formerly Carbon Re) develops autonomous control software that adjusts fuel mix, kiln speed and oxygen levels in real time.3
Ministry of Energy
In winter 2025–2026, Uzbekistan's gas shortfall reached approximately 6 mln m³ per day.4
Presidential Decree
From 2026, the government will allocate UZS 100 bn annually for AI and digitalisation in the building materials sector.5
AI systems rely on the plant's historical process data. A plant that has not collected data first needs measurement and archiving.
Data layer: the foundation for AI
MEENTAKA collects and stores process and laboratory data and transfers it securely to a partner AI system. AI control itself is provided by a specialised vendor.
- 01Collection
- DCS / SCADA
- Laboratory
- Meters
- 02Archive
- Time series
- Shift
- Batch
- 03Quality
- Data completeness
- Faulty signals
- Calibration
- 04Transfer
- AI partner
- Reports
- Production cost
Modules
The current maturity level is shown next to each module.
| Process data collection and archiving | DCS/SCADA integration | Engineering capability |
|---|---|---|
| Linking laboratory results | By time and batch | Engineering capability |
| Data quality monitoring | Signal dropouts and faulty signals | Engineering capability |
| Integration with AI partner | Secure transfer | In development |
How we start
- 01
Data audit
Which signals exist and where they are stored.
Outcome: readiness map.
- 02
Archive
3 months of data for the kiln line.
Outcome: history suitable for analysis.
- 03
Partner selection
Trials with AI vendors.
Outcome: pilot terms.
- 04
Subscription
Data layer service.
Outcome: continuous data.
What is measured
| Data completeness | Recorded / expected signals | Archive |
|---|---|---|
| Heat consumption | kcal/kg clinker | Meters, laboratory |
| Process upsets | Hours | Archive |
| Laboratory linkage | Share of linked results | System |
What is needed to start
- Chief Process Engineer
- Read access to DCS/SCADA
- Laboratory log
- IT security requirements
What we do not promise
- Firm timeline and price without an audit
- Exchange rules and government decisions
- Repair of plant equipment
- Unmeasured results or savings
- Replicating results announced by vendors
Self-check
- Are kiln signals stored for at least 3 months?
- Is gas consumption measured separately per kiln?
- Is clinker analysis recorded with timestamps?
- Are signal dropouts monitored?
- Is there a secure way to transfer data to an external partner?
- Is heat consumption calculated in kcal/kg?
- Is the cause of process upsets recorded?
- Are operator decisions recorded in a log?
- Have you held discussions with an AI vendor?
- Is there a person responsible for data?
AI readiness audit
We review your kiln line data and show what is missing for AI deployment.
- Readiness map
- Archive plan
- Implementation fee and monthly subscription
Other solutions in this industry
- QM-01From exchange contract to loading
- QM-02Energy consumption and cost per tonne
- QM-03Batch and quality passport
- QM-05Advanced control of mills and raw mix
- QM-06Predictive maintenance
- QM-07Ready-mix concrete dispatching
- QM-08Digitising construction materials procurement
- QM-09Carbon and emissions accounting
- QM-10Alternative fuel and fuel blend management
Sources
- Carbon Re (now Gigaton): «AI co-pilot for plant optimisation», partner content. cemnet.com, 2025.
- Innovate UK Business Connect: «AI takes the heat out of decarbonisation» (Heidelberg Materials, Mokrá plant). 2025.
- «AI cement optimisation firm Gigaton raises US$26m». cemnet.com, 2026.
- Ministry of Energy data: winter 2025–2026 gas restrictions. spot.uz, 26.02.2026.
- Presidential Decree on the development of the building materials industry (PQ-365). spot.uz, 03.12.2025; buxgalter.uz.