Building materials · QM-04 · AI-based kiln control

AI can run the kiln, but not without data.

Leading cement groups are introducing AI-assisted control of the kiln and preheater tower. In Uzbekistan, with gas supply constrained, fuel remains a major share of production cost.

Platform: Plant Pulse

−5.4%

Reduction in specific heat consumption at Carbon Re (Gigaton) customers, according to the company.1

$26 mln

Investment raised by Gigaton (formerly Carbon Re) in 2026.3

6 mln m³

Daily gas shortfall in winter 2025–2026, according to the Ministry of Energy.4

A plant that does not collect data has nothing for AI to learn from.

Who it is for

CEO
Fuel costs.
Chief Process Engineer
Kiln operation and clinker quality.
Chief Power Engineer
Gas and heat consumption.
Head of IT
Data and integration.

Where the problem lies

  • No archive

    DCS data is not stored, or is stored only briefly.

  • Laboratory kept separate

    Clinker analysis is not linked to process data.

  • Fuel metered only in total

    Gas and coal consumption is not measured separately per kiln.

  • No access for vendors

    There is no secure way to transfer data.

How the loss is calculated

Fuelheat consumption gap (kcal/kg clinker) × clinker output (t per year) × fuel cost per unit of heat
Instabilityprocess upset hours (h per year) × hourly output (t/h, valued at cost per t)
Qualityreprocessed clinker (t per year) × cost per tonne
Delaymonths of delay in AI deployment × potential savings per month

Calculate with your data

Kiln fuel: measured specific heat consumption vs. your own target scenario

This calculator estimates kiln fuel cost for one period you choose, for example a month or a year.

Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.

Values stay in this page and are not sent to the server.

Scenario estimate

0 / 5 values entered

Enter your operating figures to see the estimate.

All results are estimates, not promises. The target heat consumption is set by you and is not presented as achievable. No AI system is assumed to guarantee any result. The difference only shows the possible fuel effect if that target were actually reached. Use meter and laboratory data for heat consumption, and check signal completeness. If several fuels are used, enter a weighted average calorific value and price. Vendor-claimed results, exact timelines and prices are not assessed without an audit.

Formulas and assumptions

This calculator estimates kiln fuel cost for one period you choose, for example a month or a year. It uses measured specific heat consumption (kcal/kg clinker), clinker output for that period, the fuel's net calorific value and the fuel price. It shows the baseline cost, the cost at a target heat consumption you enter, and the difference between them. Only fuel cost is covered. Process instability, quality losses (reprocessed clinker), implementation delay, electricity, repairs and the cost of an AI system are excluded. These loss types are not added together.

Baseline fuel cost
Actual heat consumption (kcal/kg) × clinker (t) × 1000 (kg/t) ÷ net calorific value (kcal/unit) × fuel price (currency/unit). The result applies to the chosen period.
Fuel cost in target scenario
Target heat consumption (kcal/kg) × clinker (t) × 1000 (kg/t) ÷ net calorific value (kcal/unit) × fuel price. Output and price are assumed unchanged. This is a scenario you entered, not a forecast.
Difference between baseline and target cost
(Actual − target heat consumption, not below 0) (kcal/kg) × clinker (t) × 1000 ÷ net calorific value × fuel price. This is the possible fuel effect if the target were reached, not guaranteed savings. Implementation costs are not deducted.

Facts and global practice

  • Carbon Re (partner content)

    At customers using Carbon Re AI process control, specific heat consumption fell by 5.4% and the alternative fuel share rose by 3.8%.1

  • Innovate UK

    In 2024, the Carbon Re platform was deployed at Heidelberg Materials' Mokrá plant in the Czech Republic; the plant reduced its fuel costs.2

  • Cemnet

    Gigaton (formerly Carbon Re) develops autonomous control software that adjusts fuel mix, kiln speed and oxygen levels in real time.3

  • Ministry of Energy

    In winter 2025–2026, Uzbekistan's gas shortfall reached approximately 6 mln m³ per day.4

  • Presidential Decree

    From 2026, the government will allocate UZS 100 bn annually for AI and digitalisation in the building materials sector.5

AI systems rely on the plant's historical process data. A plant that has not collected data first needs measurement and archiving.

Data layer: the foundation for AI

MEENTAKA collects and stores process and laboratory data and transfers it securely to a partner AI system. AI control itself is provided by a specialised vendor.

  1. 01Collection
    • DCS / SCADA
    • Laboratory
    • Meters
  2. 02Archive
    • Time series
    • Shift
    • Batch
  3. 03Quality
    • Data completeness
    • Faulty signals
    • Calibration
  4. 04Transfer
    • AI partner
    • Reports
    • Production cost

Modules

The current maturity level is shown next to each module.

Process data collection and archivingDCS/SCADA integrationEngineering capability
Linking laboratory resultsBy time and batchEngineering capability
Data quality monitoringSignal dropouts and faulty signalsEngineering capability
Integration with AI partnerSecure transferIn development

How we start

  1. 01

    Data audit

    Which signals exist and where they are stored.

    Outcome: readiness map.

  2. 02

    Archive

    3 months of data for the kiln line.

    Outcome: history suitable for analysis.

  3. 03

    Partner selection

    Trials with AI vendors.

    Outcome: pilot terms.

  4. 04

    Subscription

    Data layer service.

    Outcome: continuous data.

What is measured

Data completenessRecorded / expected signalsArchive
Heat consumptionkcal/kg clinkerMeters, laboratory
Process upsetsHoursArchive
Laboratory linkageShare of linked resultsSystem

What is needed to start

  • Chief Process Engineer
  • Read access to DCS/SCADA
  • Laboratory log
  • IT security requirements

What we do not promise

  • Firm timeline and price without an audit
  • Exchange rules and government decisions
  • Repair of plant equipment
  • Unmeasured results or savings
  • Replicating results announced by vendors

Self-check

  1. Are kiln signals stored for at least 3 months?
  2. Is gas consumption measured separately per kiln?
  3. Is clinker analysis recorded with timestamps?
  4. Are signal dropouts monitored?
  5. Is there a secure way to transfer data to an external partner?
  6. Is heat consumption calculated in kcal/kg?
  7. Is the cause of process upsets recorded?
  8. Are operator decisions recorded in a log?
  9. Have you held discussions with an AI vendor?
  10. Is there a person responsible for data?

AI readiness audit

We review your kiln line data and show what is missing for AI deployment.

  • Readiness map
  • Archive plan
  • Implementation fee and monthly subscription

Sources

  1. Carbon Re (now Gigaton): «AI co-pilot for plant optimisation», partner content. cemnet.com, 2025.
  2. Innovate UK Business Connect: «AI takes the heat out of decarbonisation» (Heidelberg Materials, Mokrá plant). 2025.
  3. «AI cement optimisation firm Gigaton raises US$26m». cemnet.com, 2026.
  4. Ministry of Energy data: winter 2025–2026 gas restrictions. spot.uz, 26.02.2026.
  5. Presidential Decree on the development of the building materials industry (PQ-365). spot.uz, 03.12.2025; buxgalter.uz.