Building materials · QM-03 · Batch and quality passport

Quality is set in the laboratory. Liability travels with the shipment.

An electronic registry of construction materials that do not meet safety requirements is now maintained; manufacturers listed in it cannot take part in public procurement. Being able to show which batch, with which test result, went to which buyer is now a commercial matter.

Platform: Plant Pulse, Goods Flow

116

Companies manufacturing and supplying hazardous materials, according to the registry (February 2026).1

at least 80%

Share of local materials in state-funded social and other facilities.2

25%

Required share of eco-friendly and energy-efficient materials in design review from 01.07.2026.2

A certificate covers the product type. The buyer asks about the batch.

Who it is for

CEO
Access to public procurement.
Head of Laboratory
Test results and samples.
Warehouse Manager
Batch locations and dispatch.
Commercial Director
Documents for buyers.

Where the problem lies

  • Results in a logbook

    Test results are kept in paper or Excel logs and are not automatically linked to the batch number.

  • Pallets without batch data

    Which batch a pallet in the warehouse belongs to is shown only on its label, not in the system.

  • Generic shipments

    Documents show the product type but not the batch. When a buyer asks, someone has to search.

  • Slow complaint response

    When a quality claim arrives, tracing the batch and other buyers takes days.

How the loss is calculated

Procurement opportunityvalue of public procurement tenders (UZS per year) × probability of being unable to participate
Complaintsnumber of claims (per year) × investigation time per claim (hours) × hourly cost (UZS/hour)
Returnstonnage of returned batches (t per year) × price (UZS/t)
Document preparationnumber of requests (per month) × preparation time per request (hours)

Calculate with your data

Quality Certificate and Batch Document Preparation: Staff Time Cost

This calculator estimates the monthly staff time, and its cost, spent preparing responses to customer requests for quality certificates and batch documents.

Use spaces for thousands and a dot or comma for decimals. Use the same currency throughout.

Values stay in this page and are not sent to the server.

Scenario estimate

0 / 4 values entered

Enter your operating figures to see the estimate.

The target preparation time is your own assumption and is not presented as attainable. Measure actual times before and after any change. Freed hours do not automatically become cash savings unless they are redeployed or payroll actually changes. The hourly cost should include wages, payroll taxes and workplace overheads, but not other loss types. The calculation period is one month.

Formulas and assumptions

This calculator estimates the monthly staff time, and its cost, spent preparing responses to customer requests for quality certificates and batch documents. It compares the current situation with a target preparation time that you define. The scope covers document preparation labour only. Complaint investigations, returned batches, tender opportunities, software and implementation costs are excluded. Enter all values from your own site data. The result is an estimate, not a guaranteed saving.

Current: document preparation cost
Requests (requests/month) × current preparation time (min/request) ÷ 60 × hourly cost (currency/hour) = monthly cost.
Scenario: preparation cost at target time
Requests (requests/month) × target preparation time (min/request) ÷ 60 × hourly cost (currency/hour) = scenario monthly cost.
Cost difference (current minus scenario)
Requests × (current time − target time, min) ÷ 60 × hourly cost. Negative values are shown as 0. This is an estimated opportunity, not a guaranteed saving.
Staff hours potentially freed
Requests (requests/month) × (current time − target time, min/request) ÷ 60 = hours/month. Negative values are shown as 0. This expresses the cost difference above in hours and is not added to it.

Facts and global practice

  • Supervision Inspectorate

    From 01.03.2026, an electronic registry of manufacturers and suppliers of construction materials that do not meet safety requirements is maintained; the registry lists 116 companies.1

  • Presidential Resolution

    Manufacturers of materials found to be hazardous are barred from public procurement; the list is published on the websites of Uzpromstroymateriallar and government agencies.2

  • Presidential Resolution

    From 01.02.2026, once an order is issued, hazardous materials must be sent to a landfill or for recycling.2

  • Presidential Resolution

    Public procurement projects must use at least 80% local materials.2

  • Presidential meeting

    The share of energy-efficient and environmentally friendly materials is to reach 25% in 2026 and 35% by 2030.3

  • Regulation (buxgalter.uz)

    From 01.07.2026, the use of generic IKPU (product classification) codes for construction materials will be restricted in stages.4

Requirements are shifting from product type to batch and document. Manufacturers who can show this in a system rather than on paper will have an advantage in public procurement.

One chain from test result to buyer

Every batch enters the system with its laboratory result, bags and pallets are linked to the batch, and the batch is shown on the shipment.

  1. 01Laboratory
    • Sample
    • Test result
    • Release
  2. 02Batch
    • Bag and pallet
    • Label
    • Storage location
  3. 03Shipment
    • Buyer
    • ESF + ETTN
    • Batch number
  4. 04Document
    • Batch passport
    • Buyer request
    • Complaint trail

Modules

The current maturity level is shown next to each module.

WMS: finished goods warehouseLocation by pallet and batchCommercially available
Laboratory and batch passportResults linked to the batchEngineering capability
Batch document for the buyerGenerated automatically per shipmentEngineering capability
ESF + ETTN and 1C exchangeBatch shown on documentsCommercially available

How we start

  1. 01

    Quality audit

    Review of laboratory, warehouse and shipping processes.

    Outcome: break points.

  2. 02

    Pilot on one product

    One product type for 30 days.

    Outcome: full batch traceability.

  3. 03

    Scale-up

    All products and warehouses.

    Outcome: entire production.

  4. 04

    Subscription

    Monthly report and support.

    Outcome: complaint and request trends.

What is measured

Batch traceabilityShare of shipments with a known batchSystem
Result timeFrom sample to releaseLaboratory module
Request responseFrom buyer request to documentSystem
Complaint trailTime to find all buyers of one batchSystem
Warehouse accuracyVariance between system and accounting recordsWMS, 1C

What is needed to start

  • Head of Laboratory
  • Batch numbering procedure
  • Warehouse layout
  • Test access to 1C

What we do not promise

  • Firm timeline and price without an audit
  • Exchange rules and government decisions
  • Repair of plant equipment
  • Unmeasured results or savings
  • Certification and test results
  • Removal from the registry

Self-check

  1. Is the test result stored in the system with the batch number?
  2. Is the batch of each pallet visible in the system?
  3. Is the batch number shown on the shipment?
  4. Is the time needed to find all buyers of a given batch known (in minutes)?
  5. If a buyer requests a batch passport, can you provide it immediately?
  6. Can you document the share of local materials in public procurement?
  7. Are IKPU codes selected precisely for each product?
  8. Are returned batches recorded separately?
  9. Are the laboratory and warehouse in one system?
  10. Is there a person responsible for quality?

Quality audit

We review the chain from laboratory to buyer and show where you lose batch traceability.

  • Break-point map
  • Pilot plan for one product
  • Implementation fee and monthly subscription

Sources

  1. Construction and Housing & Utilities Supervision Inspectorate: registry of construction materials not meeting safety requirements. spot.uz, 25.02.2026.
  2. Presidential Resolution on the development of the construction materials industry (PQ-365). spot.uz, 03.12.2025; buxgalter.uz.
  3. Presidential meeting: share of energy-efficient and environmentally friendly materials. spot.uz, 20.11.2025.
  4. “Which IKPU codes apply to construction materials in 2026”. buxgalter.uz, 2026.